What AI actually does: drafting, hints, inspection
The assistant earns its keep in routine: Russian-language commands like place the sockets, assemble the panel or check against the rules, Ghost inline hints while you draw, a Composer that turns text into plan plus diff, an inspector with 40-plus rules, and a 0–100 project score that shows where the design is thin.
On top of drafting sits norm control: 25 automated checks against IEC 60364 flag the classic misses — unprotected groups, wrong RCD types, overloaded schedules — before a human reviewer ever opens the set. Think of it as a tireless proofreader with perfect memory of the checklist and zero understanding of physics.
What AI never does: currents, faults, selectivity
Every number in the project comes from elsewhere: the local deterministic calculation core built on published methods — installed and design power, design current and cos phi, one- and three-phase fault currents with the phase-to-neutral loop, voltage drop against the 5 percent limit, cross-section and heating checks, selectivity over time-current characteristics.
This separation is deliberate and a safety feature: language models are probabilistic and must never invent an ampere. The engine repeats every figure bit-for-bit on rerun, cites the method behind it, and still marks the result preliminary. Important disclaimer: all calculations are advisory preliminary materials until approved and signed by the responsible engineer — AI assistance does not change that.
Checks help, the engineer signs: 25 reasons plus one
Automated checks are a net, not a stamp. They catch missing protection, selectivity gaps visible without manufacturer curves, and schedule inconsistencies — but full selectivity to fault-current levels needs manufacturer time-current data, otherwise the verdict stays honestly partial or conditional with a stated boundary.
The signature rule is simple: anything the checker passes still needs human review, and anything it flags needs a human decision. For kindergartens, schools and hospitals, formal expert review is mandatory. The panel passport, the schedules and the estimate leave the editor as preliminary materials — the approving engineer turns them into documentation.
Tokens and limits: 20,000 a month and the arithmetic
AI runs on metered tokens. Pro includes 20,000 AI tokens a month; top-ups cost 2 for 1,000, 15 for 10,000 and 60 for 50,000. Included tokens burn at the end of the period, one-off packs live until spent but no longer than 365 days, and when the balance hits zero the AI features pause until you refill.
Budget it like plotter paper: bulk drafting and Composer generations eat tokens, verification runs and panel assembly sips them. A freelancer doing a few flats a month rarely leaves the included quota; a bureau running the assistant on every workstation tracks the meter weekly. Prices exclude VAT and the current figures live on the pricing page.
Where AI fails quietly: four traps
- Confident filler: the assistant phrases suggestions fluently even where the model has no data — field conditions, utility requirements, wall structures. Verify against the site, not the chat.
- Norm blending: IEC, NEC, BS 7671 and PUE logics differ; an answer valid under one standard can violate another. Pin the standard of the project before accepting advice.
- Stale prices: the estimate draws from price books on a 14-day cycle — AI commentary cannot know yesterday's supplier quote. Re-date prices before defending an estimate.
- Drawing illusions: an elegant generated layout can hide an unprotected group or an unbalanced panel. Run the deterministic checks after every AI pass, not instead of them.
Human-in-charge workflow: a five-step loop
Put the junior to work without giving away the stamp: first, draft with AI — placement, panel assembly, schedules. Second, run the deterministic calculations and the 25 checks. Third, walk the failures yourself: protection, RCD types, selectivity boundaries, phase balance. Fourth, fix the model, not the PDF — one model feeds plan, single-line, panel and estimate, so corrections propagate. Fifth, export the PDF set and sign it as the engineer.
This loop keeps the speed gain and the liability where they belong: minutes saved on drafting, responsibility kept on the human with the seal.
Checklist for checking AI output
| Verify | How |
|---|---|
| Every figure | Rerun the deterministic core; no number from chat goes into the set |
| Standard fit | Confirm IEC 60364 (or the project standard) behind each check |
| Selectivity claims | Demand manufacturer curves; otherwise mark partial with boundary |
| Prices and dates | Re-date the price books; 14-day freshness is the honesty mark |
| Sign-off | Engineer reviews, engineer signs; exports are preliminary until then |
Pin this list next to the monitor. AI that is checked this way is the fastest junior you have ever had; unchecked, it is the most eloquent risk in the office.
FAQ
Does AI compute fault currents?
No. Fault currents, voltage drop, heating checks and selectivity come from the local deterministic calculation core built on published methods — the assistant never invents a number. AI can draft the layout and run the 40-plus-rule inspector, but every figure is computed, repeatable, and still preliminary until the engineer signs it.
How many AI tokens monthly?
Pro includes 20,000 AI tokens a month; included tokens burn at period end. When they run out, AI features pause until you top up: 1,000 for 2, 10,000 for 15, 50,000 for 60. One-off packs last until spent, up to 365 days. Check the pricing page before quoting a client.
Will AI replace engineers?
No. The assistant accelerates drafting — placement, hints, plan-to-text Composer with diffs, a 0–100 project score — but responsibility, sign-off and expert review stay with the engineer. For kindergartens, schools and hospitals, formal expert review is mandatory regardless of tooling.
Who owns AI errors?
The engineer does. Calculations and AI outputs are advisory by licence: exports are preliminary materials until signed, and liability sits with the approving engineer, not the model. That is why every AI-assisted set needs the human checklist from this article before issue.
Related articles
Assistant for drafting, engine for numbers — open the editor
Let the assistant place sockets and flag issues, then verify with the deterministic core. Start free in the browser — Pro 40/mo with 20,000 AI tokens. Plans: gorkycad.com/en/pricing/.
Open GorkyCAD