Loads: dryers, sterilisers, wash-point
A salon's load profile is unusual for its size: many small but heat-intensive appliances running simultaneously during peak hours. Hand dryers and straighteners draw 1.5–2.5 kW each and cycle constantly, sterilisers and towel warmers add long continuous loads, and the wash-point contributes pumps or a water heater plus lighting. Air conditioning and display light run on top of all that.
Start with an equipment list with rated powers per workstation, then sum by zone rather than by room. This table becomes the basis for group division, cable sizing and the incomer request — and it is exactly what the landlord asks for when allocating capacity.
- Hairdressing stations: dryers, straighteners, clippers, mirror lighting.
- Manicure and pedicure desks: lamps, sterilisers, dust extractors.
- Wash-point: water heater or booster, basin lighting, sockets.
- Common loads: air conditioning, ventilation, showcase light, reception desk.
Workstation sockets: how many and where
The rule of thumb is two double sockets per workstation: one pair for tools in active use and one for chargers, lamps and trimmers that stay plugged in. Place them at worktop height or in floor boxes where islands stand free, never behind mirrors where cords stretch across the work zone. Add a spare double socket for every two stations for vacuum cleaners and rotation.
Distribute stations across two or three socket groups so one fault does not stop the whole hall. Keep socket circuits separate from lighting — staff must be able to isolate a faulty tool circuit without working in the dark. Mark which breaker feeds which row of stations on the panel legend; masters will thank you at the first nuisance trip.
Task and display light on separate groups
Workstation lighting decides service quality: masters need neutral, shadow-free light with good colour rendering at mirrors and desks. The working combination is general ceiling light plus mirror or desk task light, each on its own group or scene so brightness can be tuned without touching the hall. Display light — showcases, entrance, signage — lives on a separate group with its own schedule.
Switching deserves the same attention as luminaires: the hall, stations and display should switch independently, ideally from two or three points (entrance, reception, utility corner). Emergency and standby lighting for corridors and exits follows local code and is verified against the 25 IEC 60364 checks rather than assumed.
Wet wash zone and protection
The wash-point is the salon's special location: water plus electrical equipment in one tight corner. Basins, water heaters and nearby sockets belong on a dedicated group with RCD protection, and socket outlets keep their distance from taps and spray zones per applicable location rules. Metal pipework and conductive parts are bonded where the standard requires.
Run the automatic verification early: 25 checks to IEC 60364 flag missing RCD coverage, wrong disconnection assumptions and unprotected wet-zone circuits while the plan is still easy to change. Anything the checker flags goes to the engineer for a decision — automatic checks assist the review, they never replace the signature. Document the final protection choice on the single-line diagram with breaker ratings and RCD types.
Panel, metering and documents
A small salon panel typically holds an incomer, a meter, station socket groups, wash-point and water-heater groups, lighting groups split into task and display, plus air conditioning and a spare way or two for the next tenant's idea. Keep the layout legible: incomer at the top, grouped rows with a printed legend, and one spare module row if the enclosure allows.
The handover set is the same as for any small commercial job: floor plan with points and routes, panel schedule with breaker ratings, single-line diagram generated from the model, cable schedule, bill of quantities with a price date, and the estimate. When the model is single, the plan, the single-line and the schedule stay consistent through every revision — nothing is redrawn by hand.
Common mistakes in salon projects
The classic salon failure is one socket group for the whole hall: the first Saturday peak trips it and half the masters stand idle. The second is lighting on the same breaker as sockets, so every tool fault kills the light. The third is a wash-point without its own RCD-protected group, discovered only when a heater fault takes down the reception desk.
Commercial mistakes follow: no spare ways in the panel, no printed legend, no price date on the estimate, and a handover pack the next electrician cannot read. Each of these is cheap to prevent on paper and expensive to fix after opening day — run the checklist before the fit-out crew arrives, not after.
Build it in GorkyCAD: one model, full set
Draw the salon plan with zones, place workstation sockets and luminaires, and divide groups right in the model. The single-line diagram (SLD) is generated from the model automatically, the panel is assembled with phase balancing, and the cable schedule, bill of quantities and estimate follow without retyping. Automatic checks flag protection and grouping issues while changes are still cheap.
The documentation export is a PDF set — plan, single-line, panel schedule, schedules and estimate — plus DXF, XLSX, IFC, BCF and GLTF exchange formats on the Pro plan. Start free in the browser with offline PWA support, and move to Pro at €40/mo when project limits or full calculations and exports are needed. All engineering results stay preliminary until the responsible engineer approves them.
FAQ
How many sockets per workstation?
Plan two double sockets per workstation as a minimum: one for the dryer or straightener in active use and one for the charger, trimmer or lamp that stays plugged in. Add one spare double socket per two stations for cleaning equipment and rotation. Feed stations from two or three different groups so a single tripped breaker does not darken the whole hall, and keep cable routes accessible for refits.
Should the wash-point sit on its own group?
In most cases, yes. The wash-point combines water and continuously running electrical equipment, so a dedicated group with RCD protection simplifies fault-finding and lets staff isolate one basin without stopping the hall. Where a salon has two or more wash units plus a water heater, split them across groups and verify the protection ratings with an engineer before sign-off.
What light do work zones need?
Workstations need neutral, shadow-free task light with good colour rendering so masters see true hair and skin tones; ceiling spots plus mirror lighting is the common combination. The showcase and entrance get accent display light on a separate scene or group. Keep task and display lighting on different groups so evening mode does not leave masters in the dark.
Is 15 kW enough for a salon?
There is no universal figure. Add up the rated powers of dryers, straighteners, sterilisers, wash-point equipment, air conditioning and display light, then apply demand factors — in a small salon several heat appliances can run at once, so the simultaneity assumption matters more than elsewhere. Agree the available capacity with the landlord and the grid operator early; any calculation below is preliminary until an engineer approves it.