--- Skip to content
Reference 2026-10-21 Reference

Electrical Abbreviations: 150+ Terms Explained

Every electrical drawing is a compressed document. One line on a panel schedule — “RCBO 20A, 30mA, C16” — carries protection type, rating, sensitivity and circuit number. When two people read it differently, the mistake usually reaches site before anyone notices.

Author: GorkyCAD Team

Draw it, size it, export it

Start from a floor plan in the browser: devices, circuits, a panel schedule, a single-line diagram and a calculated bill of materials.

Open demo See pricing

This reference lists 150 abbreviations used in design, installation and estimating, grouped by area. It is not a code: where a standard defines a term, the standard wins, and usage varies between countries and offices.

How to read this table

  • The same letters can mean two things. CT is a current transformer, and cable tray in some offices. Context decides.
  • Capitals matter. mA is a milliamp; MA is a mega-amp. m² is an area and M² is a typo.
  • A legend beats a guess. Every issued drawing should carry one, even when the terms look obvious to you.

Power, energy and supply

Abbr. Meaning
ACAlternating current
DCDirect current
VVolt
AAmpere
WWatt
VAVolt-ampere, apparent power
kVAKilovolt-ampere
kWKilowatt
kWhKilowatt-hour, energy
kVARKilovolt-ampere reactive
PFPower factor
HzHertz, frequency
RMSRoot mean square
THDTotal harmonic distortion
UPSUninterruptible power supply
PVPhotovoltaic
VFDVariable frequency drive
VSDVariable speed drive
ATSAutomatic transfer switch
GGenerator

Protection and switchgear

Abbr. Meaning
MCBMiniature circuit breaker
MCCBMoulded case circuit breaker
ACBAir circuit breaker
CBCircuit breaker
RCDResidual current device
RCCBResidual current circuit breaker
RCBOResidual current breaker with overcurrent protection
GFCIGround fault circuit interrupter
AFCIArc fault circuit interrupter
ELCBEarth leakage circuit breaker
OCPDOvercurrent protective device
SPDSurge protective device
CTCurrent transformer
PTPotential transformer
SCShort circuit
IscShort-circuit current
IcuRated breaking capacity
IcsService breaking capacity
InNominal current
IrLong-time setting current
ImInstantaneous setting current
IΔnResidual operating current
IPIngress protection rating
IKImpact protection rating
O/LOverload

Cables, wiring and containment

Abbr. Meaning
XLPECross-linked polyethylene
PVCPolyvinyl chloride
LSZHLow smoke zero halogen
SWASteel wire armour
MICCMineral insulated copper clad
NM-BNon-metallic sheathed cable, US
AWGAmerican wire gauge
CSACross-sectional area
CCCCurrent-carrying capacity
CPCCircuit protective conductor
NNeutral
LLine conductor
L1Phase 1
L2Phase 2
L3Phase 3
T&ETwin and earth
UoPhase-to-earth voltage
UPhase-to-phase voltage
EMTElectrical metallic tubing
IMCIntermediate metal conduit
RMCRigid metal conduit
FMCFlexible metal conduit
LFMCLiquidtight flexible metal conduit
CPRConstruction Products Regulation class
NYYPVC-insulated power cable
NYMPVC-insulated installation cable

Earthing and bonding

Abbr. Meaning
PEProtective earth
PENCombined protective earth and neutral
EGCEquipment grounding conductor
GECGrounding electrode conductor
MEBMain equipotential bonding
TTEarthing system, electrodes only
TN-SEarth and neutral separate throughout
TN-CEarth and neutral combined throughout
TN-C-SCombined, then separate
ITIsolated earth system
ZsEarth fault loop impedance
ZeExternal loop impedance

Standards and regulation

Abbr. Meaning
NECNational Electrical Code, US
NFPANational Fire Protection Association
IECInternational Electrotechnical Commission
IEEEInstitute of Electrical and Electronics Engineers
ANSIAmerican National Standards Institute
ULUnderwriters Laboratories
NEMANational Electrical Manufacturers Association
BSBritish Standard
BS 7671UK wiring regulations
ENEuropean norm
CEConformité Européenne marking
UKCAUK conformity marking
ATEXEU explosive atmospheres directives
OSHAOccupational Safety and Health Administration
AHJAuthority having jurisdiction
AS/NZS 3000Australian and New Zealand wiring rules
IEC 60364Low-voltage electrical installations
IEC 61439Low-voltage switchgear assemblies
IEC 60529Degrees of protection, IP code
IEC 62305Lightning protection
IEC 60079Explosive atmospheres

Drawings, systems and project terms

Abbr. Meaning
SLDSingle-line diagram
BOMBill of materials
BOQBill of quantities
GAGeneral arrangement drawing
I/OInput and output list
PLCProgrammable logic controller
HMIHuman-machine interface
SCADASupervisory control and data acquisition
LVLow voltage
MVMedium voltage
HVHigh voltage
ELVExtra-low voltage
MDBMain distribution board
DBDistribution board
MCCMotor control centre
MSBMain switchboard
TPNTriple pole and neutral
SPNSingle pole and neutral
SPSingle pole
DPDouble pole
TPTriple pole
4PFour pole
MEPMechanical, electrical and plumbing
EPCEngineering, procurement, construction
RFIRequest for information
T&MTime and materials
RevRevision
NTSNot to scale
FFLFinished floor level
QTYQuantity

Loads, motors and lighting

Abbr. Meaning
FLAFull load amps
FLCFull load current
LRALocked rotor amps
MCAMinimum circuit ampacity
MOPMaximum overcurrent protection
LEDLight-emitting diode
CCTCorrelated colour temperature
CRIColour rendering index
lmLumen
lxLux
cdCandela
KKelvin, colour temperature
LPDLighting power density
DALIDigital addressable lighting interface
PIRPassive infrared sensor
EMEmergency lighting circuit

Ten pairs that get confused

Pair The difference that matters
MCB / MCCBMiniature device for final circuits versus moulded-case breaker with adjustable settings
RCD / RCBOResidual current only versus residual plus overcurrent in one device
Icu / IcsRated breaking capacity versus the service value it can interrupt repeatedly
In / IrDevice rating versus the setting you actually apply
PE / PENProtective earth versus a conductor carrying both earth and neutral
TN-S / TN-C-SEarthing separated at the origin versus separated partway along
Uo / UPhase-to-earth versus phase-to-phase. Mixing them changes every calculation
kVA / kWApparent power versus real power; 100 kVA is not 100 kW
RCCB / ELCBCurrent-operated versus the older term that also covered voltage-operated devices
NTS / scale barNot to scale, never measure versus calibrated scale, measure after checking

Using abbreviations in schedules and drawings

  1. Expand on first use. Write “residual current breaker with overcurrent protection (RCBO)” once, then abbreviate.
  2. Keep one legend per project. Multiple legends drift, and a drifted legend is worse than none.
  3. Match schedule to plan. If the plan says S12, the schedule says S12.

GorkyCAD Pro generates circuit and panel schedules from the drawing model, so labels stay consistent and the legend is part of the export. It runs in a browser, with no offline mode, and its 41 automated checks are design aids, not certification. See the electrical drawing checklist and house wiring plan software.

Put the legend to work. Open the 41-rule check on a demo project: the legend drives the panel schedule, so labels cannot drift between drawing and export. The 41-rule design check explains each rule.

Ready to run this on your project?

Import a plan, run the calculations and export a checked PDF set. Free demo, no installation, no card.

Open demo See pricing

Frequently asked questions

Why do the same abbreviations mean different things in different countries?

National codes evolved separately. GFCI and ELCB describe similar protective ideas from different traditions, and IEC uses Uo/U where NEC texts say line-to-neutral and line-to-line. Read the legend of the drawing in front of you.

Is MCCB the same as MCC?

No. MCCB is a moulded case circuit breaker; MCC is a motor control centre, an assembly rather than a device. This pair causes real procurement errors.

Should I write mm² or mm2?

mm² is correct and unambiguous. mm2 is common in plain-text systems that cannot render superscripts. Pick one and use it everywhere.

What does IP44 mean?

The first digit is solids, the second is water: IP44 means protected against objects over 1 mm and against splashing water. Exact definitions live in IEC 60529.

Do I need to define abbreviations the client already knows?

Yes. The installer, the inspector and the next engineer read the same file, often years later.

Build the package, then export it. Start the free demo, see pricing, read the documentation and browse the blog.

Sources