What is checked
Panel: input protection, RCD, labeling, scheme. Sockets: grounding, polarity, RCD groups. Cable: cross-sections, installation method. Bathrooms: zones and IP.
Documents
Electrical project, test protocol (insulation resistance, RCD trip, grounding), equipment certificates, panel passport.
Typical violations
No RCD on socket circuits; PEN splitting without re-grounding; wrong cross-sections; no labels; no test protocol; violations of bathroom zones.
How to prepare
Pass the test protocol before the inspection; check the panel per the scheme; the inspector compares the installation with the project.
If violations found
The inspector issues a list of deficiencies with a deadline. After the fix — a re-inspection, usually free.
How GorkyCAD helps
The project, SLD, specifications and panel passport are generated from the model — the documents are ready before the work starts.
Frequently asked questions
Yes, all articles and calculators are completely free.
The site offers 21 free calculators: cable sizing, breakers, RCD, voltage drop and more.
In GorkyCAD Pro: plans, panels, calculations and a PDF set for free.
Write to hello@gorkycad.pro — specialists will review and correct it.