Service size is not a guess. It is a sum: list every load, apply demand, convert to amps, and pick the next standard service. This guide does that for a house, with a worked 100 m² example.
Method follows NEC Article 220 (standard method), with IEC 60364 load-current formulas and BS 7671 demand notes where they differ. All figures below are calculated step by step.
1. The method in five steps
List connected loads in kW. Apply demand factors (not everything runs at once). Convert the diversified kW to amps. Add the largest motor at 125%. Pick the next standard service size (100 A, 150 A, 200 A single/three-phase).
Demand detail many miss: NEC Table 220.42 gives lighting and receptacle demand as 100% of the first 3,000 VA plus 35% of the remainder for homes (hotels and warehouses differ — use the right row). On the 100 m² example the general lighting/receptacle connected load of 6.0 kW becomes 3.00 + 0.35 × 3.00 = 4.05 kW, exactly the table row in section 2. Small-appliance and laundry branch circuits enter separately per 220.52 at no less than 1,500 VA each (two small-appliance + one laundry = 4.50 kW) before any demand. Keep these two buckets apart on the sheet — mixing them is the most common arithmetic error in DIY service calculations.
2. Typical household loads table
| Load | Connected kW | Demand applied | Diversified kW |
|---|---|---|---|
| Lighting + sockets (100 m²) | 6.0 | first 3 kW 100%, rest 35% (NEC 220.42) | 4.05 |
| Cooker / range | 9.0 | Table 220.55, one range ≈ 8 kW demand | 8.00 |
| Water heater | 4.5 | 100% (storage, 220.82) | 4.50 |
| Dryer | 5.0 | 100% first unit | 5.00 |
| HVAC (heat pump) | 5.5 | 100% + 25% of largest motor | 5.50 + 0.60 |
| Small appliances + laundry circuits | 4.5 | per 220.52 (2 × 1.5 kW + 1 × 1.5 kW) | 4.50 |
Diversified total ≈ 4.05 + 8.00 + 4.50 + 5.00 + 6.10 + 4.50 = 32.15 kW connected basis before service conversion (NEC standard method keeps lighting/socket demand inside the table; HVAC at nameplate).
3. Worked example: 100 m² all-electric house
Given: single-phase 230 V service option vs three-phase 400 V. Diversified demand from the table: 32.15 kW. Single-phase current: I = 32150 / (230 × 0.95) = 32150 / 218.5 = 147 A. Three-phase current: I = 32150 / (1.732 × 400 × 0.95) = 32150 / 658.2 = 48.9 A per phase.
Verdict: single-phase needs a 150–200 A service (cable, meter, and main to match); three-phase fits a 3 × 63 A service with headroom. This is why all-electric homes usually go three-phase.
4. Same house with gas cooking and heating
Remove cooker (9 kW) and heat pump (5.5 kW), keep water heating electric. Diversified ≈ 32.15 − 8.00 − 6.10 = 18.05 kW. Single-phase: 18050 / 218.5 = 82.6 A → standard 100 A service. Three-phase: 18050 / 658.2 = 27.4 A/phase → 3 × 32 A. Gas halves the service.
5. Choosing 100 A vs 200 A
Pick 100 A when diversified single-phase demand stays under ~80 A (NEC continuous-load 80% rule on the main: 100 A × 0.8 = 80 A continuous). Pick 150/200 A when: all-electric heating or cooking, EV charger (7–11 kW adds 30–48 A single-phase), workshop, pool heat pump, or planned extension. A 7.4 kW EV charger alone draws 7400 / 230 = 32.2 A — it decides the service by itself.
6. Neutral, ground, and panels
Size the neutral for the maximum unbalanced load (220.61) — in homes with many single-phase branches, full-size neutral is the safe default. Grounding electrode conductor follows NEC Table 250.66 (service-based: 100 A → 8 AWG copper, 200 A → 4 AWG copper). Keep spare ways: a 200 A panel with 30–40 spaces costs little extra at build time and saves a replacement later.
7. UK/India equivalents
BS 7671 uses diversified demand similarly (Appendix A guidance, plus designer judgment): a 100 m² UK home typically lands on a 60–100 A single-phase supply. In India (IS 732 / NBC 2016), connected-load-per-area plus diversity gives similar bands: 5–8 kW sanctioned load for a mid-size flat, 10–15 kW for a villa — convert with I = P/(√3·U·cosφ) at 400 V three-phase or P/(U·cosφ) at 230 V single-phase.
8. Common mistakes
- Adding nameplates without demand. 60 A of breakers does not mean 60 A of load — diversity halves it.
- Forgetting the EV charger. 32 A continuous dwarfs lighting and sockets.
- Sizing the main at 100% of diversified load. Continuous portion needs the 125% / 80% treatment.
- Single-phase for all-electric. 147 A single-phase is a thick cable and a big bill — three-phase is cheaper.
- No spare capacity. A full panel on day one means a replacement at the first extension.
9. Checklist
- Every load listed with kW and duty (continuous or not).
- Demand factors applied per NEC 220 (or local equivalent).
- Largest motor +25% added.
- Converted to amps at the right voltage and cosφ.
- Next standard service up, with spare ways.
- Neutral and grounding conductor sized from the service.
10. Worked example 2: EV charger plus heat pump on 100 A
Given: existing 100 A single-phase service, adding a 7.4 kW EV charger (32.2 A) and a 5 kW heat pump (21.7 A at 230 V, cosφ = 1.0 for the resistive backup stage; compressor stage about 14 A running). Question: does the 100 A main hold? Start from the section-3 diversified base without heating: 18.05 kW = 82.6 A was the gas-heating case — but that already assumed cooking gas. Take the honest diversified base for this house: lighting/sockets 4.05 + water heater 4.50 + dryer 5.00 + small appliances 4.50 = 18.05 kW = 82.6 A before the new loads. Add EV 32.2 A and heat pump 21.7 A at full backup: 82.6 + 32.2 + 21.7 = 136.5 A — over 100 A. With diversity (car charges at night, heat pump cycles, dryer off): apply 0.6 to the EV-plus-heating block per designer judgment and local rules: (32.2 + 21.7) × 0.6 = 32.3 A → total 82.6 + 32.3 = 114.9 A — still over. Answer: the 100 A service does not hold both additions at once. Options: three-phase upgrade (114.9 A single-phase ≈ 38 A/phase three-phase — fits 3 × 50 A), load management (charger pauses while the heat pump backup runs), or a smaller 3.7 kW charger (16 A). Write the chosen option on the calculation sheet — inspectors ask exactly this question.
11. Panel schedule for the 100 m² house (where the amps live)
A service number means nothing without the branch split. Below is the panel the section-3 example implies (single-phase 230 V version, continuous loads flagged).
| Circuit | Load | Current | Breaker | Wire Cu |
|---|---|---|---|---|
| Lighting ×3 | 1.2 kW each | 5.2 A | 10 A / B | 1.5 mm² |
| Sockets ×4 | 3.0 kW each div. | 13.0 A | 16 A / C | 2.5 mm² |
| Cooker | 8.0 kW dem. | 34.8 A | 40 A / C | 10 mm² |
| Water heater | 4.5 kW cont. | 19.6 A | 25 A / C | 4 mm² |
| Dryer | 5.0 kW | 21.7 A | 25 A / C | 4 mm² |
| Heat pump | 5.5 kW | 23.9 A | 32 A / D | 6 mm² |
| EV charger | 7.4 kW cont. | 32.2 A | 40 A / C | 10 mm² |
Check the main: sum of breakers is 10×3 + 16×4 + 40 + 25 + 25 + 32 + 40 = 256 A of breakers on a 150–200 A main — normal, because diversity says they never all pull at once. The main is sized from diversified demand (147 A → 150–200 A service), not from the breaker sum. If anyone sizes the main from the breaker total, the service comes out two sizes too big.
12. Sanity checks that catch bad estimates
Three ratios flag a wrong calculation before it costs money. First, watts per square metre: the 100 m² example at 32.15 kW diversified = 322 W/m² — high because it is all-electric with EV; a gas-heated home at 18 kW = 180 W/m² is typical, and anything above 400 W/m² deserves a second look at double-counted loads. Second, amps per phase vs main: 48.9 A/phase on a 63 A three-phase main = 78% loaded — healthy; above 90% means the next standard size. Third, largest single load vs service: the 8 kW cooker demand (34.8 A single-phase) is 23% of a 150 A service — fine; one load above 50% of the main means the service exists for that load and everything else should be rechecked. Run these three ratios on every estimate; they take a minute and catch most spreadsheet errors.
See also
Run the same five steps on your rooms: open the free demo, place the loads, and get service size with the calculation attached.
Try it on your own plan — open the free demo at https://gorkycad.com/cad/?demo=1, no registration needed.
Frequently asked questions
How do I calculate the total load of my house?
List every load in kW, apply demand factors (NEC Article 220 — not everything runs at once), add 25% of the largest motor, then convert diversified kW to amps. Our 100 m² example lands at 32.15 kW diversified, i.e. 147 A single-phase or 48.9 A per phase three-phase.
What service size do I need for a 100 m² all-electric house?
About 150–200 A single-phase, or 3 × 63 A three-phase. Three-phase is the normal answer — the same kilowatts at 400 V need roughly a third of the current per conductor.
Does an EV charger change the service size?
Yes, decisively. A 7.4 kW single-phase charger draws 32.2 A continuous — more than all lighting and sockets combined. Add it before picking 100 A vs 200 A.
How do UK and Indian supplies compare?
Same physics, different paperwork: a UK 100 m² home typically sits on 60–100 A single-phase (BS 7671 demand guidance); an Indian villa sanctions roughly 10–15 kW (IS 732/NBC 2016), converted with the same P/(U·cosφ) formulas.
Should I leave spare panel capacity?
Yes — spare ways and ~20% headroom on the main. Panels fill fast (EV, heat pump, extension), and a replacement panel costs far more than empty spaces at build time.