--- Skip to content
Design 2025-06-08 · 8 min

Emergency Power — Choice

Integrating pulse-output meters into your design. Connection diagrams, CT selection, AMR system based on GorkyCAD.

Author: GorkyCAD Team

Comparison

TypeTimeCost
UPSMinutes-hoursFrom 5 000 ₽
GeneratorDays (fuel)From 30 000 ₽
Battery stationHours-daysFrom 100 000 ₽

For a house

Boiler + pump + fridge: UPS 1-3 kW or a battery station; long outages — generator with ATS. Gas generator — quiet and cheap fuel.

For an office

Server UPS — online 5-10 minutes to shut down; long — generator or battery. Critical loads on the UPS, the rest — on the generator.

Design

ATS, cable from the generator with the correct section, grounding of the generator, ventilation and noise. The switch is interlocks.

Solar + battery

A hybrid inverter with batteries covers short outages and reduces the bill — the most popular option now.

Why design

A wrong backup is a burned generator or a dead boiler in winter. The design counts the load and the time.

Frequently asked questions

Is this article free?
Yes, all articles and calculators are completely free.
Where can I run calculations?
The site offers 21 free calculators: cable sizing, breakers, RCD, voltage drop and more.
How do I prepare an electrical project?
In GorkyCAD Pro: plans, panels, calculations and a PDF set for free.
Found an error in the article?
Write to hello@gorkycad.pro — specialists will review and correct it.

Open free calculators →

Related tools

Open free calculators →