Scope: plan, panel, single-line, estimate
Write the scope before naming a price, and make it a closed list: floor plan with cable routes and point schedules, distribution panel with breaker ratings, single-line diagram generated from the model, cable schedule, bill of quantities and the estimate. State the revision allowance and the delivery format — a PDF set for sign-off — in the same paragraph.
Name the exclusions with equal care: no site supervision, no utility approvals running, no smart-home programming beyond the agreed points. Every exclusion you write down is an argument you will not have at handover. One page of scope beats ten messages of assumptions.
Pricing your time without dumping
Price from hours, not from fear. Break the job into survey and inputs, modelling, panel and single-line, automatic checks and corrections, documentation and handover — then multiply by the hourly rate you actually need, including taxes, software and non-billable time. A first job estimated at real hours beats a dumped price that you subsidise with evenings.
Quote fixed scope with a named revision cap and keep two numbers separate: the base price and the price of extras. When the client asks for another room or a redesign halfway through, you point at the scope line instead of negotiating from zero. Dumping wins the first job and loses the second, because the client remembers the dumped number.
Client inputs: the acceptance checklist
Rework almost always traces back to missing inputs, so collect them in writing before modelling. The minimum set: a dimensioned floor plan with wall materials and ceiling heights, the equipment list with rated powers, incomer capacity and metering details, photos of the existing panel and risers, and one named person authorised to approve decisions.
Agree the rules of the game alongside the inputs: how comments arrive (one collected list per round), how fast approvals come, and what happens when inputs change mid-project. A changed wall layout after grouping is a paid extra with a new mini-deadline — say it upfront while everyone is friendly, not mid-dispute.
Capping revision rounds
Two rounds inside the base price is the sane default: one on the draft set, one on the near-final set. Define a round as a single collected comment list, not a week of scattered calls and messenger voice notes. Everything beyond the cap is priced per round and scheduled after current commitments.
The cap protects both sides more than it restricts them. The client learns to collect thoughts instead of streaming them, and you stop redrawing the same kitchen for the third time. Log every round with a date and a revision mark on the sheets — the log is your memory when the final invoice is questioned.
Delivery: the PDF set and sign-off
Deliver a set the next electrician can build from without calling you: plan with routes and points, panel schedule with ratings, single-line diagram, cable schedule, bill of quantities with a price date, and the estimate. Because all sheets derive from one model, the plan, the single-line and the schedules agree with each other — the most common handover embarrassment, mismatched sheets, disappears.
Close with a short acceptance note: scope delivered, revision log attached, liability boundary stated — engineering results are preliminary until the responsible engineer approves them. Collect the signature, the payment and, while the impression is fresh, a testimonial plus one referral. Then archive the project with its revision history instead of scattering files across messengers.
Mistakes that eat the first fee
The classic quartet: open scope quoted by guess, unlimited revisions promised to sound friendly, inputs accepted verbally and forgotten, and delivery as a pile of screenshots instead of a signed set. Each one converts paid hours into free evenings, and together they can push the first job below zero.
The fix is procedural, not heroic: one page of scope, a named revision cap, a written input checklist, a dated revision log, a signed acceptance note. None of it requires experience — only the discipline to send the paperwork before starting the drawing.
Run the first job in GorkyCAD end to end
Model the flat once and let the set follow: plan with points and routes, panel assembled with phase balancing, single-line generated automatically, cable schedule, bill of quantities and estimate without retyping. Automatic checks — 25 to IEC 60364 — flag protection and grouping issues while corrections are still cheap, and the PDF set goes to the client for sign-off.
Start free in the browser with offline PWA support: model the job, show the client the result, and move to Pro at €40/mo when unlimited projects, full calculations and exports pay for themselves. Keep token top-ups in mind — €2, €15 and €60 packs — if AI assistance becomes part of the workflow. The tooling never replaces the engineer: calculations and AI suggestions stay preliminary until approved.
FAQ
What should I charge for a first flat job?
There is no rate card here on purpose: prices depend on city, scope and your speed. Estimate honestly instead — hours for survey, modelling, panel, single-line, checks and handover, multiplied by the hourly rate you need. Quote the first job as a fixed scope with a named revision allowance; if the client wants more, it becomes a paid extra, not free evening work.
How many revision rounds should I include?
Include two rounds in the base price: one after the draft set and one after the near-final set. Name what a round means — a collected list of comments, not a drip feed of calls — and price further rounds separately. The cap disciplines both sides: the client collects thoughts, and you stop redrawing the same plan.
What should I ask the client upfront?
The floor plan with real dimensions, wall materials and ceiling heights; the equipment list with rated powers or at least appliance names; the incomer capacity and metering arrangement; photos of the existing panel and risers; and one contact person authorised to approve decisions. Missing inputs are the top cause of rework — request them in writing before you start modelling.
How do I turn one job into repeat work?
Deliver a PDF set the next electrician can build from — plan, panel schedule, single-line, cable schedule, bill of quantities and estimate — plus a short acceptance note listing what was agreed. Then ask for two things: a testimonial while the impression is fresh and a referral to one neighbour or colleague. Repeat work comes from tidy handover, not from discounts.
Related articles
- How electricians price work
- Check a contractor estimate
- First project: hour one workflow
- Electrical project stages
Close your first paid job end to end — open the editor
Take your first paid flat project through GorkyCAD: plan, panel and single-line from one model, PDF set for sign-off. Start free in the browser — Pro at €40/mo when the jobs grow.
Open GorkyCAD