Signing a lease on a small shop or cafe without checking the electrics is the most expensive signature most owners ever make. The espresso machine trips the breaker on day two, the kitchen needs three-phase you do not have, and the landlord points at the clause that says the electrical system is your problem. This checklist takes one site visit and a clamp meter, and it answers the only question that matters: can this space carry your load safely and legally.

Work through all twenty points before you sign. Anything you skip becomes a change order after opening, when every day of downtime costs revenue.

1. Service size: read the main breaker first

Open the panel and read the main breaker rating and the service voltage before anything else. A small cafe typically needs 60 to 100 A single-phase at 230 V, or three-phase 400 V where heavy kitchen loads exist. If the main is 32 or 40 A on an old single-phase service, your equipment list will not fit without a service upgrade that takes weeks and landlord approval.

Worked check. Add your loads with demand: espresso machine 3.5 kW, oven 5 kW, fridge and freezer 1.2 kW, HVAC 4 kW, lighting and sockets 3 kW. Total connected about 16.7 kW. At 230 V single-phase with power factor 0.95, current is P divided by U times cos phi: 16,700 divided by 218.5 gives about 76 A. A 63 A service is too small; you need 100 A or load management, decided before the lease, not after. Note that motor loads such as HVAC and refrigeration add starting current several times their running value, so breaker curves matter too: a C-curve breaker tolerates five to ten times rated current briefly per IEC 60898, while a B-curve trips earlier. Confirm the installed curves suit motor starting, or the morning startup sequence will trip even a correctly sized board.

2. Single-phase or three-phase: the kitchen decides

One commercial oven, dough mixer, or tankless heater above 6 kW usually pushes you to three-phase. Check whether three-phase is present in the building riser, not just promised. Running a new three-phase service into a rented unit can cost several thousand and needs the building owner and utility to agree.

Rule: if any single appliance exceeds 5 kW resistive or 3.5 kW motor load, confirm three-phase availability in writing. A converter or phase balancer is a compromise, not a plan.

LoadTypical powerSupply needed
Espresso machine, 2-group3.0 to 4.5 kWDedicated 16 to 20 A circuit
Deck or convection oven5 to 9 kWThree-phase preferred
Fridge + freezer + display1.0 to 1.8 kWSeparate circuit, 10 to 16 A
HVAC split units3 to 5 kWDedicated circuit each

3. Circuits: count what exists versus what you need

Count breaker ways and list what each feeds. A cafe needs at minimum: two kitchen socket circuits, one counter circuit, lighting on two circuits, HVAC, water heater, outdoor or signage, and two spare ways. That is ten to twelve ways before spares. A six-way panel means a board replacement on day one.

Check the breaker-to-wire match on the two most loaded circuits. A 20 A breaker on 2.5 sq mm wire is standard; a 32 A breaker on 2.5 sq mm is a violation per NEC 310.16 and IEC 60364-4-43. Photograph the panel schedule and compare it with what is actually connected. Then open two socket outlets and check the wire actually in the box matches the schedule: optimistic paperwork with thinner wire in the wall is one of the most common findings in leased units, and only a visual check catches it.

4. Kitchen loads get dedicated circuits, no sharing

Espresso machines, ovens, fryers, and dishwashers each get their own circuit from the panel, sized to the nameplate. Sharing a 16 A circuit between a 3 kW espresso machine drawing 13 A and a 2 kW kettle drawing 8.7 A gives 21.7 A on a 16 A breaker: nuisance tripping guaranteed during the morning rush.

Verify socket ratings match: 16 A sockets on 16 A circuits, industrial 32 A outlets where the appliance plug demands it. Check that high-heat zones use heat-resistant flex and that sockets sit away from steam and splash zones.

5. Lighting: level, zones, and emergency

Measure lighting in zones, not as one switch. Customer area, counter, kitchen, storage, and toilet need separate switching so the kitchen can stay lit while the dining mood dims. Target maintained illuminance around 200 lux for dining and 300 to 500 lux for kitchen work surfaces per IEC 60364 and good practice derived from EN 12464-1.

Confirm emergency lighting exists on escape routes with battery backup, and that exit signs are lit. Missing emergency lighting is an inspection failure in most jurisdictions and a liability no lease discount covers. Walk the route yourself with the lights off if the agent allows it: a corridor that looks fine in daylight can go pitch dark at night.

6. RCD and GFCI protection where water and hands meet

Every socket in the kitchen, bar, toilet, and outdoor area must have 30 mA residual current protection: RCD under IEC 60364-4-41 or GFCI under NEC 210.8. Test every device with its test button and, if possible, with a plug-in tester. A dead RCD that never trips is worse than none, because it pretends to protect.

Check selectivity lightly: the whole shop must not go dark when one kitchen socket leaks. Split RCDs across at least two groups so a fault in the dishwasher does not kill the tills and lights.

LocationProtection requiredTest on visit
Kitchen and bar sockets30 mA RCD or GFCITest button trips
Toilets, outdoor, signage30 mA RCD or GFCITester confirms trip
Whole installationMain switch + split groupsOne fault does not kill all

7. Grounding and bonding you can verify in ten minutes

Find the main grounding bar, the grounding electrode conductor, and bonding to water and gas pipes. Green-yellow or bare copper conductors must be continuous, clamped, and labelled. Ask for the last electrode resistance measurement; effective grounding verified by test is the requirement under NEC Article 250 and IEC 60364-5-54.

Red flags: cut bonding jumpers after plumbing work, painted-over clamps, extension leads used as fixed wiring, and sockets without earth continuity. Any of these is a renegotiation point, not a cosmetic issue. Budget half a day for an electrician with a loop tester to verify earth fault loop impedance and RCD trip times before you sign: numbers on paper beat promises from the agent, and the report costs far less than one week of lost trade.

8. Mini-case: the cafe that almost signed a 40 A trap

A couple leasing a 45 sq m cafe loved the foot traffic and nearly signed on a Friday. Saturday check with this list found: 40 A single-phase main, six-way panel fully loaded, espresso circuit shared with the microwave, no RCD on bar sockets, and no bonding to the new plastic-plumbed water line. The upgrade quote was 3,800 plus three weeks for utility approval. They renegotiated: landlord funded the service upgrade and two extra circuits before handover, documented in the lease appendix. Opening slipped two weeks, but day-one tripping and a mid-service blackout were avoided.

9. The twenty-point walkthrough list

Take this list on site and tick every line. One: main breaker rating photographed. Two: voltage and phases confirmed. Three: three-phase availability in writing if needed. Four: breaker ways counted, spares present. Five: breaker-to-wire match on top two circuits. Six: dedicated circuits for each heat appliance. Seven: socket ratings match plugs. Eight: lighting zoned in at least three groups. Nine: emergency lighting present and lit. Ten: 30 mA protection on kitchen, bar, toilet, outdoor. Eleven: RCD test buttons trip. Twelve: one fault does not kill the whole shop. Thirteen: grounding bar and electrode conductor found. Fourteen: bonding to water and gas intact. Fifteen: last test report or measurement exists. Sixteen: no extension leads as fixed wiring. Seventeen: panel labelled and accessible. Eighteen: landlord scope versus tenant scope in writing. Nineteen: capacity for your equipment total with twenty percent headroom. Twenty: upgrade cost and timeline agreed before signature.

10. Assumptions and when to walk away

This checklist assumes small retail and food premises up to about 100 sq m under NEC or IEC 60364, visited with basic tools and panel access in 2026. It does not replace a licensed inspection for final acceptance, nor does it cover hazardous areas, commercial kitchens with gas interlocks, or buildings needing full rewiring design. Price bands here are planning ranges that vary by city and utility. Walk away when the service cannot be upgraded, when the landlord refuses written electrical scope, or when protection and grounding are missing across the board: those three cannot be fixed cheaply after signing.

Check your own future shop the same way engineers check a plan: open the free demo at https://gorkycad.com/cad/?demo=1, no signup needed, and sketch the circuits before you commit to the lease.

Sketch your shop circuits before you sign: free demo at https://gorkycad.com/cad/?demo=1, no signup needed.

Frequently asked questions

What service size does a small cafe need?

Usually 60 to 100 A single-phase, or three-phase where ovens or tankless heaters exceed about 5 kW. Add your loads with demand and check the total current against the main breaker before signing anything.

How many circuits should the unit have?

Ten to twelve ways minimum for a cafe including kitchen, counter, lighting zones, HVAC, water heater, and spares. A full six-way board means a replacement on day one.

Which circuits need RCD or GFCI?

All kitchen, bar, toilet, and outdoor sockets need 30 mA protection per IEC 60364-4-41 and NEC 210.8. Test every device on the visit; a dead RCD protects nobody.

What is the biggest lease trap?

Adequate-looking space on an inadequate service: 40 A single-phase with no three-phase available. The upgrade costs thousands and needs landlord and utility approval, so confirm it in writing first.

Can I model my shop circuits before signing?

Yes. Sketch the plan in the free demo at https://gorkycad.com/cad/?demo=1, place the kitchen loads on dedicated circuits, and check the totals. It takes one evening and prevents a five-year mistake.