A subpanel adds capacity where the main panel cannot reach: garage, workshop, addition, or outdoor loads. Done right it is a clean feeder, four wires, isolated neutral, and a load calculation that holds up. Done wrong it is a parallel neutral path, an undersized feeder, or a 60 A panel fed like a 30 A afterthought.

This guide sizes a subpanel end to end: load math, feeder and breaker, 4-wire vs 3-wire rules, grounding, and a complete 60 A garage example. Norms: NEC Article 220 load calculation, NEC 250.32 and 250.122 grounding, NEC 310.16 ampacity, IEC 60364-5-52 and BS 7671 context.

What a Subpanel Must Achieve

A subpanel must carry the calculated load without overheating, clear faults through a low-impedance ground path, keep neutral and ground separate past the service, and leave spare ways for the future. It must also be labeled, accessible, and fed by a breaker that protects the feeder conductors per NEC 240.4.

Plan three things before buying: the load list with demand, the feeder route with length and method, and the grounding arrangement at the building. Most failures trace to skipping one of these: no load math, no voltage drop check, or a 3-wire feed where 4-wire is required.

Load Math: NEC Article 220 Method

List every load at its nameplate, apply demand where the code allows, and sum. General lighting at 3 VA per square foot per NEC 220.12, small-appliance and laundry circuits at 1500 VA each, fastened appliances at nameplate, motors at 125 percent of full-load current, EV charging at 125 percent continuous.

Example garage 30 x 20 ft (600 sq ft): lighting 600 x 3 = 1800 VA; receptacles 2 x 1500 = 3000 VA counted in the feeder; air compressor 240 V x 12 A = 2880 VA x 1.25 = 3600 VA; heater 3000 VA; EV charger 32 A x 240 V = 7680 VA x 1.25 = 9600 VA continuous. Total = 1800 + 3000 + 3600 + 3000 + 9600 = 21000 VA. At 240 V that is 21000 / 240 = 87.5 A before diversity.

Apply realistic diversity: lighting and receptacles rarely peak with all machines. Using standard demand for a workshop feeder, the counted load often lands near 60 to 70 A. Size the feeder to the calculated number, not to the sum of breaker handles. Breaker handles always add up to more than the feeder.

Feeder and Breaker Sizing Table

Copper THHN, 75 C column, before corrections. Ground per NEC 250.122. Feeders over 100 A follow the same method with larger sizes.

Subpanel ratingFeeder copperFeeder aluminumFeeder breakerGround copper
30 A10 AWG 5.26 mm28 AWG 8.37 mm230 A 2-pole10 AWG
40 A8 AWG 8.37 mm26 AWG 13.3 mm240 A 2-pole10 AWG
60 A6 AWG 13.3 mm24 AWG 21.2 mm260 A 2-pole10 AWG
80 A4 AWG 21.2 mm22 AWG 33.6 mm280 A 2-pole8 AWG
100 A2 AWG 33.6 mm21/0 AWG 53.5 mm2100 A 2-pole8 AWG
125 A1/0 AWG 53.5 mm22/0 AWG 67.4 mm2125 A 2-pole6 AWG

Metric equivalents: 30 A on 6 mm2, 40 A on 10 mm2, 60 A on 16 mm2, 80 A on 25 mm2, 100 A on 35 mm2 copper. Always recheck with ambient and bundling corrections from NEC 310.15 or IEC 60364-5-52 before finalizing.

4-Wire vs 3-Wire: The Rule That Fails Inspections

Modern rule is simple: feeders carry four wires, two hots plus neutral plus a separate equipment ground. At the subpanel the neutral bar floats isolated and the ground bar bonds to the enclosure. Neutral and ground meet only at the service per NEC 250.24 and 250.32.

Three-wire feeds survive only in narrow grandfathered cases: existing installations without a ground path where no metallic paths interconnect buildings, and even then many jurisdictions require an upgrade on modification. New work in a separate building always needs four wires plus its own grounding electrode system per NEC 250.32(A).

The test is one screw: if the green bonding screw or strap connects neutral to the subpanel can, remove it. Neutral current on the ground wire, tingling pipes, and nuisance GFCI trips all trace to this single error.

Grounding at the Subpanel and the Building

Inside the panel: isolated neutral bar, bonded ground bar, separate ground wire back to the service, all metal parts bonded. At a detached building: add grounding electrodes, typically two ground rods, bonded to the subpanel ground bar with a grounding electrode conductor sized per NEC 250.66. The feeder ground and the electrodes serve different purposes and both are required.

Ground wire size follows the feeder breaker per NEC 250.122: 10 AWG copper for 30 and 60 A, 8 AWG for 80 and 100 A, 6 AWG for 125 A. The electrode conductor follows NEC 250.66 by feeder size. Keep grounds continuous, unspliced where required, and protected where exposed.

Voltage Drop and Conduit

Feeders should stay within about 3 percent drop alone so the total with branches stays near 5 percent. Formula single-phase equivalent for 240 V line-to-line: drop percent = I x L x 2 x rho / (S x U) x 100 for the 120 V leg check, or I x L x rho / (S x U) appropriately for balanced 240 V loads. Use rho 0.021 for operating copper.

Feeder 60 A, 240 VLengthSizeDropVerdict
6 AWG 13.3 mm220 m13.31.9%Pass
6 AWG 13.3 mm235 m13.33.3%Marginal, upsize
4 AWG 21.2 mm235 m21.22.1%Pass
4 AWG 21.2 mm250 m21.23.0%Pass at limit

Conduit fill per NEC Chapter 9: 60 A copper in 1 inch EMT is comfortable, aluminum 4 AWG usually wants 1-1/4 inch. Buried PVC needs depth per NEC Table 300.5 and expansion fittings where required.

Full Example: 60 A Garage

Given: calculated load 52 A after demand, 30 m run in PVC conduit underground, three current-carrying conductors (two hots plus neutral counted), ambient 30 C. Select feeder, breaker, ground, voltage drop.

Step 1: base table. Copper 6 AWG at 75 C = 65 A. Corrections: Ca 1.00, Cg 1.00 for three conductors. Installed Iz = 65 A. Against 52 A load: passes. Breaker: 60 A two-pole, since 65 A wire protects a 60 A breaker and 52 A load sits below it.

Step 2: ground. Feeder breaker 60 A gives 10 AWG copper ground per NEC 250.122. Detached garage adds two ground rods bonded to the ground bar with conductor per NEC 250.66.

Step 3: voltage drop. Drop = 52 x 30 x 0.021 / (13.3 x 240) x 100 for the 240 V equivalent balanced portion = 32760 / 3192000 x 100 = 1.03 percent for balanced 240 V loads; check the worst 120 V leg at half load plus imbalance separately and keep it under 3 percent. With mostly 240 V machines this feeder passes.

Step 4: panel. Minimum 12 spaces for 6 branch circuits plus main lug or main breaker; buy 16 to 20 spaces. Neutral isolated, ground bonded, bonding screw removed, directory filled per NEC 408.4.

Mini Case: What Goes Wrong

A homeowner feeds a garage with 10 AWG on a 30 A breaker but installs a 60 A subpanel with six 20 A branches totaling 120 A of handles. The feeder overheats on a cold evening with heater plus compressor plus EV at reduced rate. Fix: load calculation showed 52 A, so the correct feeder was 6 AWG on 60 A all along. Breaker handles do not define the load; the calculation does.

Assumptions and When This Does Not Apply

This guide assumes TN or grounded US service, copper or aluminum feeders in conduit at 30 C, and a detached or attached garage with mixed loads. It does not apply to services over 400 A, to feeders in hazardous locations, or to islanded solar or generator sources with their own grounding rules. It does not replace fault-loop and selectivity verification at the main panel.

Common Mistakes

Bonding neutral to the subpanel can is number one. Undersizing the feeder to the breaker handles sum instead of the calculated load is number two. Forgetting the building electrodes at a detached garage is number three. Running 3-wire because the trench is already dug is number four. Leaving no spare ways forces the next circuit onto tandem breakers the panel may not accept.

Related reading: electrical load calculation for a house, grounding vs bonding, conduit fill. Build the feeder in the free demo at https://gorkycad.com/cad/?demo=1 and export the panel schedule with feeder, breaker and ground noted.

Frequently Asked Questions

Five answers on 4-wire rules, ground rods, and breaker sizes. See FAQ entries.

Lay out the subpanel in the free demo: https://gorkycad.com/cad/?demo=1 — add the feeder, ground bar and branch breakers, then export.

Frequently asked questions

Do I need 4 wires to a garage subpanel?

Yes for new work: two hots, neutral, plus a separate ground. At the subpanel the neutral floats and the ground bonds to the can. They meet only at the service.

Does a detached garage need ground rods?

Yes. NEC 250.32 requires a grounding electrode system at a separate building, typically two rods, bonded to the subpanel ground bar in addition to the feeder ground wire.

What size feeder for 60 A?

6 AWG copper or 4 AWG aluminum at 75 C, on a 60 A two-pole breaker, with 10 AWG copper ground. Recheck for ambient, bundling and voltage drop on long runs.

Can neutral and ground share a bar in a subpanel?

No. That single bond belongs only at the service. In a subpanel it puts neutral current on appliance frames and pipes. Remove the bonding screw or strap.

How many spare ways should I leave?

At least 20 to 30 percent free. For six planned branches buy 12 to 16 spaces minimum. A full panel on day one guarantees an expensive replacement later.