A cable that carries 27 A on paper can overheat at 16 A in a hot, crowded conduit. The difference is derating: the mandatory reduction of ampacity for ambient temperature and for mutual heating of grouped cables. Skip it and the breaker never trips while the insulation slowly cooks.

This guide shows derating with real numbers: correction tables, a full 4 mm2 example in a bundle at plus 40 C, the common error of sizing from the base table only, and when derating does not apply. Norms: NEC Table 310.15(B)(1) and 310.15(C)(1), IEC 60364-5-52 Tables B.52.14 to B.52.17, BS 7671 Appendix 4.

What Derating Actually Is

Ampacity tables assume reference conditions: typically 30 C air or 25 C ground and no more than three current-carrying conductors. Real installations are hotter or more crowded, so heat escapes more slowly. Correction factors below 1.0 convert table current into installed current: Iz = I_table x Ca x Cg, where Ca is ambient and Cg is grouping.

Both US and IEC systems work this way. NEC applies a temperature factor from Table 310.15(B)(1) and an adjustment factor from 310.15(C)(1). IEC applies Ca from Table B.52.14 and Cg from B.52.17. The numbers differ slightly but the method is identical. Always derate from the column matching the insulation temperature, then compare against the breaker using the termination limit.

Derating is not optional conservatism. It is part of the ampacity definition. An inspector who finds six loaded conductors on a 20 A breaker with 14 AWG in a hot attic will fail it even though the base table says 20 A at 75 C.

Ambient Temperature Table

Higher air temperature means less cooling. Values below are typical for PVC 70 C and XLPE 90 C insulation. Use the row matching your insulation.

Ambient CPVC CaXLPE CaWhat it means
251.031.02Cooler than reference, slight bonus
301.001.00Reference, no change
350.940.96Warm roof space
400.870.91Hot attic, boiler room
450.790.87Plant room in summer
500.710.82Extreme, avoid if possible

Note how fast PVC loses capacity: at 40 C you keep only 87 percent. XLPE keeps 91 percent. That 4 point gap is one reason designers specify 90 C cable in hot locations even when terminations limit the final circuit to 75 C values.

Bundling and Grouping Table

Each loaded conductor heats its neighbors. Only current-carrying conductors count: neutrals that carry only imbalance in a balanced three-phase set, grounds, and switched-off spares do not count. All conductors of one circuit in the same conduit do count.

Loaded conductorsNEC factorIEC factor typicalExample
1-31.001.00One circuit alone
4-60.800.80Two circuits sharing a conduit
7-90.700.70Three circuits together
10-200.500.59Crowded trunking
21-300.450.55Panel riser, reroute it

NEC counts slightly differently above 9 conductors, but the message is the same: beyond six loaded conductors you lose 20 percent or more. Splitting into two conduits is often cheaper than upsizing every cable.

Full Example: 4 mm2 in a Bundle at 40 C

Given: 4 mm2 copper, PVC, in conduit with 5 loaded conductors total, ambient 40 C. Base table IEC method B gives about 27 A for one circuit at 30 C. Find the installed ampacity.

Step 1: ambient factor Ca = 0.87 at 40 C for PVC. Step 2: grouping factor Cg = 0.80 for 4 to 6 conductors. Step 3: Iz = 27 x 0.87 x 0.80 = 18.8 A. Calculation: 27 x 0.87 = 23.49, times 0.80 = 18.79 A.

Step 4: choose the breaker. The next standard size down is 16 A, because 20 A exceeds 18.8 A. So a cable that looks like a 25 A cable on the vendor page becomes a 16 A circuit in these conditions. If the load needs a full 20 A, upsize to 6 mm2: base about 34 A, derated 34 x 0.87 x 0.80 = 23.7 A, breaker 20 A. Passes.

NEC version of the same physics: 10 AWG base 35 A at 90 C for derating math, Ca 0.91 at 40 C, Cg 0.80: 35 x 0.91 x 0.80 = 25.5 A, then limit by 60 or 75 C termination and the 30 A small-conductor cap. Same conclusion, different route.

The Classic Error: Table Without Corrections

The most common sizing error is reading 27 A for 4 mm2 or 35 A for 10 AWG and stopping there. On a hot roof with six conductors in one pipe the real capacity is near 19 A. The breaker at 25 A will never trip on overload because the load is only 20 A, yet the cable runs above its temperature limit for years. Insulation hardens, cracks, and fails at a bend.

Second error: applying only one factor. Designers remember ambient but forget bundling, or the reverse. Both multiply. At 40 C with six conductors the combined factor is 0.87 x 0.80 = 0.70. Missing either one overstates capacity by 15 to 25 percent.

Third error: derating from the wrong column. NEC requires derating from the insulation column, then capping by termination temperature. Derating from the 60 C column directly understates capacity and wastes copper; skipping the termination cap overstates it.

Mini Case: Kitchen Rework

Two 20 A kitchen circuits share one conduit through a 42 C attic (Ca 0.82 PVC). Four loaded conductors give Cg 0.80. Base 12 AWG at 90 C is 30 A for math: 30 x 0.82 x 0.80 = 19.7 A. Fails for a 20 A breaker. Options: split into two conduits (Cg becomes 1.00, result 24.6 A, passes), or upsize to 10 AWG: 40 x 0.82 x 0.80 = 26.2 A, passes on a 20 A breaker. The cheapest fix is usually separation, not copper.

Second comparison, same tray at plus 35 C with six loaded conductors: Ca 0.94 for PVC at 35 C and Cg 0.80 for 4 to 6 conductors. For 2.5 mm2 with a base of 24 A: Iz = 24 x 0.94 x 0.80 = 18.0 A (24 x 0.94 = 22.56, times 0.80 = 18.05 A), so the largest breaker is 16 A. For 4 mm2 with a base of 32 A: Iz = 32 x 0.94 x 0.80 = 24.1 A (32 x 0.94 = 30.08, times 0.80 = 24.06 A), so a 20 A breaker holds with margin. If the load needs a genuine 20 A, upsizing one step from 2.5 to 4 mm2 is cheaper than splitting the tray and pulling a second route, provided conduit fill still passes. If the load is only 13 to 15 A, the 2.5 mm2 on a 16 A breaker is the economical choice and separating the tray buys nothing.

When Derating Is Not Needed

Single circuit alone in free air at 30 C or below needs no correction: Ca and Cg are both 1.00. Short conduit sleeves under 600 mm for physical protection are exempt from bundling adjustment under NEC 310.15(C)(1) exception. Spare conductors that are truly de-energized do not count. Underground derating uses soil temperature and thermal resistivity instead of air tables. Motor and welder circuits have demand rules that already account for grouping in their articles.

For IEC designers the same example uses Table B.52.14 for ambient and B.52.17 for grouping with identical multiplication order. Document both factors on the calculation sheet: a reviewer should see base current, Ca with temperature and table reference, Cg with conductor count and reference, and the final Iz next to the breaker rating. That single line prevents most inspection disputes.

Assumptions and When This Does Not Apply

Factors here assume continuous loads at the stated ambient, PVC or XLPE insulation, and no more than 30 C soil for buried runs. They do not apply to fire-rated mineral cable, to busbar, or to free-air single conductors spaced more than one diameter apart. They do not replace short-circuit withstand or voltage drop checks. In explosive atmospheres additional rules apply. Short sections in free air, such as a sub-meter pigtail outside a congested trunking, may use maker-declared free-air ratings without grouping correction, but only where the maker states it explicitly and the section genuinely cools in free air rather than lying bundled inside a warm enclosure.

Checklist Before You Finalize

Count loaded conductors honestly. Measure or estimate the hottest realistic ambient, not the average room. Pick Ca and Cg from the tables for your insulation. Derate, then cap by termination temperature and small-conductor rules. Check voltage drop. If the result forces two sizes up, price a second conduit instead. On existing installations where separation is impossible, consider XLPE 90 C cable for extra headroom, improve ventilation, or move continuous loads to a dedicated uncongested route rather than accepting a hot bundle.

How an inspector verifies this: cable marking against the schedule (size, insulation, temperature rating), conductor count in each conduit or tray compartment versus the grouping factor claimed, and the ambient assumption written on the calculation sheet. A tray photographed with seven loaded conductors where the sheet claims three is an instant fail. Keep the sheet, the tray photo, and the breaker schedule consistent, because that triangle is exactly what gets checked first.

Related reading: wire ampacity chart, voltage drop over distance, conduit fill. Model the run in the free demo at https://gorkycad.com/cad/?demo=1 with length, ambient and grouping noted on the plan.

Frequently Asked Questions

Five answers on counting neutrals, attic heat, and whether to split conduits. See FAQ entries.

Check your own derating in the free demo: https://gorkycad.com/cad/?demo=1 — set ambient, bundling and length, then verify the cable.

Frequently asked questions

Does a neutral count for bundling?

Sometimes. A neutral that carries only balanced three-phase imbalance does not count. A neutral in a single-phase multiwire branch, in nonlinear LED loads with high harmonics, or any neutral carrying full load current counts as a current-carrying conductor.

What ambient should I use for an attic?

Use the hottest realistic sustained temperature, often 40 to 45 C in summer attics. If in doubt use 40 C for PVC. One step hotter costs little compared with a cooked cable you cannot reach later.

Is it cheaper to upsize or split conduits?

With 4 to 6 conductors the grouping factor is 0.80. Splitting into two conduits restores 1.00 and often avoids one full cable size. Price both: a second short conduit usually beats upsizing long runs.

Can I use the 90 C column to avoid derating?

You still derate, but you start from the 90 C value for math, then cap by the 60 or 75 C termination rating. This is explicitly allowed by NEC 110.14(C) and is the standard way to survive hot, crowded conditions.

Does derating apply underground?

Yes but with soil tables: soil temperature, depth, and thermal resistivity replace air ambient and conduit grouping. Do not apply air Ca/Cg to buried cable.

Related reading