Most electrical fatalities do not happen because someone touched a live wire they knew about. They happen because a circuit someone thought was dead came back to life: a colleague reclosed a breaker, a standby generator started, stored energy in capacitors discharged, or a second feed nobody documented energised the busbar. Lockout tagout is the discipline that makes dead stay dead.

This guide gives the six step procedure used on commercial and residential sites, what counts as proof at each step, the mistakes that keep killing people, and how group lockout works when several crews share one board. It follows the logic of OSHA 1910.147 and NFPA 70E Article 120 without quoting them at length.

1. Prepare: know every source before touching anything

Walk the job before isolating. List every source that can feed the work zone: mains, sub boards, generators, uninterruptible power supplies, solar inverters, and control circuits that cross into the panel from another board. Read the single line diagram, then verify it against reality, because diagrams lie after ten years of modifications. Note stored energy too: capacitors, spring charged breaker mechanisms, and raised loads that can fall. Photograph the board before you start so restoration puts every cover, barrier, and label back where it belongs, and keep the photo with the permit until handover is signed.

Write the isolation points down. If you cannot name every source, you are not ready to isolate. On a house this takes five minutes. On a plant floor it can take an hour, and that hour is the cheapest insurance on the project.

2. Notify everyone affected

Tell every person who uses or could re-energise the equipment what you are about to do, why, and how long it will last. Operators, tenants, the night shift, the generator attendant. A breaker that trips the freezer in a restaurant will be switched back on by someone trying to help if nobody warned them. Agree in advance who is allowed to enter the work zone while locks are on, and where visitors must wait, so curiosity never becomes a second source of energy.

Notification is verbal plus a tag at the point of use where practical. People protect what they understand. A two sentence explanation prevents most well meaning interference.

3. Shut down in an orderly way

Stop loads through their normal controls before opening isolators. Motors, heaters, and servers should be off before you pull a switch under load. Then open each disconnecting means identified in step one. Operate them with your body to the side, face away, and never force a stiff mechanism with improvised leverage that can snap and bridge phases.

Record each opened point on your sheet. If a switch feeds through to another area that must stay live, mark that boundary clearly so nobody extends your isolation by guesswork.

4. Isolate and apply locks and tags

Lock every energy isolating device in the safe position with your personal lock, then attach a tag with your name, date, and reason. One lock per worker, one key per lock, and the key stays in your pocket. Combinations and shared keys are banned because they let someone else remove your protection.

StepActionProof it is done
1 PrepareList all sources and stored energyWritten isolation plan on paper
2 NotifyWarn operators and usersNames told, tags at points of use
3 Shut downStop loads, open isolatorsEach point ticked on the plan
4 Lock and tagPersonal lock plus tag on each pointLocks photographed, keys in pockets
5 Release energyDischarge, block, vent, earthMeter reads zero, pressure gauges zero
6 Verify deadTest before touch every timeLive-dead-live record with instrument number

Locks must be dedicated lockout devices, not luggage padlocks that anyone can cut and replace. Tags warn; only the lock physically stops operation.

5. Release all stored and residual energy

Discharge capacitors through rated resistors, release spring tension, block raised parts against falling, vent pressure, and let motors run down. Then apply temporary earths where the rules require them, so an unexpected backfeed trips protection instead of energising your work zone. Measure DC links separately: a 560 V DC bus holds charge long after the AC supply is open.

A frequent residential example is the solar inverter that keeps its DC side live in daylight even with the AC isolator open. Covering or isolating the array side per manufacturer instructions is part of this step, not an optional extra.

6. Verify dead: test before touch

Test every conductor you will touch with a rated voltage indicator: test the instrument on a known live source, test the work circuit phase to phase and phase to earth, then retest the instrument. This live-dead-live sequence catches dead batteries, wrong range settings, and broken leads. Non contact sticks are a pre check only; the proving test uses a two pole instrument with fused leads.

Repeat verification after any break, any handover, and any change in the board. A circuit proven dead at 9 am is not proven dead at 11 am if you left the room.

7. Worked example: cooker circuit in a flat

Job: add a 32 A cooker circuit to a flat board fed from a landlord riser. Sources: flat main switch, riser breaker in the basement, plus a balcony solar micro inverter tied to a socket circuit. Plan: open flat main, lock it, open riser breaker, lock it with a second hasp point, switch the micro inverter AC isolator off and lock it. Release: none stored beyond small capacitors. Verify: live-dead-live at the flat main with tester number 14, then at the new cable end. Result recorded: 0 V phase to neutral and phase to earth at both points. Total time added by the full routine: about 15 minutes. Cost of skipping it: a riser breaker someone else could reclose from the basement.

8. Group lockout without chaos

When three crews share one board, each worker still needs personal protection. The standard method is a lock box: the person in charge locks every isolation point and puts the keys inside the box, then each worker puts their own lock on the box. Nobody can re-energise until the last personal lock comes off. Permits, drawings, and the live-dead-live record live with the box.

Shift changes need a documented handover: outgoing locks come off only after incoming locks go on, with a fresh verification. Never accept someone word that it is dead. Verify it yourself with your own instrument.

RoleLock placed onResponsibility
Person in chargeEvery isolation pointOwns the plan and the key box
Each workerLock box haspPersonal lock, personal key, own verification
OperatorControls left in safe stateNo restart until formally handed back
Next shiftFresh locks before old removedRepeats live-dead-live personally

9. Five mistakes that keep appearing in reports

Using someone else lock or key. Tagging without locking and calling it done. Isolating only the obvious main while a control circuit from another board stays live. Trusting a non contact stick as proof of dead. Removing locks at the end of the shift because the job is almost finished and the next shift can sort it out. Each of these has killed. Write them on the inside of your toolbox lid if that is what it takes to remember. Add a sixth habit to the same list: never hurry the last ten minutes of a job, because most shortcuts happen when the end is in sight and attention drops.

10. Assumptions and when this does not apply

This procedure assumes low voltage work with lockable isolators available, trained adults, and cooperation of the facility. It does not cover high voltage switching programmes, live line barehand work, explosive atmospheres, or utility network operations, which need their own permits and competencies. Where isolators cannot be locked, use the prescribed alternatives such as supervised tagging with additional barriers, and record why a lock was impossible.

11. Mini case: the generator that started itself

A maintenance team isolated a workshop board for a busbar clean. They locked the mains but forgot the automatic standby generator, which exercised itself every Tuesday at noon. At 12:00 the transfer switch operated and the supposedly dead board went live. Nobody was touching conductors at that moment, so the outcome was a tripped test instrument and a frightened crew. The fix was procedural: the weekly test was rescheduled, the generator isolator joined the lockout plan, and the transfer switch got its own lock point. Luck is not a control measure.

12. Removal and restore checklist

Clear tools and people, refit every guard and cover, remove temporary earths in the reverse order, then remove locks and tags in the documented sequence with each owner present. Energise step by step and check rotation, controls, and alarms before handing back. The last action is paperwork: sign off the permit, file the live-dead-live record, and note anything unusual for the next crew.

Keep a simple permit for every lockout beyond one person and one point: job description, isolation points, names, times, and the live-dead-live readings. File it where the next crew can find it. Paperwork feels slow on the day and priceless the day something goes wrong.

Try it on your own plan: open the free demo at https://gorkycad.com/cad/?demo=1&lang=en — draw rooms, place the board, run checks and export a PDF parts list.

Frequently asked questions

Can I use just a tag without a lock?

No. A tag warns, only a lock physically prevents operation. Tagout alone is accepted only where locking is physically impossible and extra measures are documented, never as a shortcut.

Who can remove someone else lock?

Normally nobody. Removal by another person is allowed only under a documented emergency procedure with verification that the owner is absent and the area is safe, and it must be recorded.

How often must I retest for dead?

After every break, handover, or change near the board, and before touching conductors each time. A morning test does not cover the afternoon.

What about capacitors and solar DC?

They count as sources. Discharge capacitors through rated means, treat PV DC as live in daylight, and verify DC links with a suitably rated instrument.

Does group lockout need a permit?

For anything beyond a single worker and a single point, yes in practice: a written plan, a lock box, and a handover record. Memory is not a permit.