Breaker, wire, and load must agree in one pass: load current first, wire that carries it, breaker that protects the wire. Do it in that order and the chain never breaks.
This guide gives the 1.25× rule, a load → wire → breaker table, breaker curves B/C/D, and a full worked pass. Norms: NEC 210.19/210.20/240.4, IEC 60364-4-43 (Ib ≤ In ≤ Iz), BS 7671 Section 433.
1. The one rule: Ib ≤ In ≤ Iz
IEC 60364-4-43 and BS 7671 Section 433 state it plainly: load current Ib ≤ breaker rating In ≤ cable capacity Iz. The breaker protects the cable, not the appliance. Size the cable for the load, then pick the breaker between the two numbers.
2. The 1.25× rule for continuous loads
NEC 210.19(A)(1) and 210.20(A): conductors and breakers for continuous loads (3+ hours) sized at 125% of load current. A 20 A continuous heater needs conductors and breaker rated ≥ 25 A → next standard size 25 or 30 A depending on the series. Non-continuous loads use 100%.
3. Load → wire → breaker table (copper, 230 V)
| Load (Ib) | Min conductor (method C) | Breaker In | Typical use |
|---|---|---|---|
| 10 A (2.3 kW) | 1.5 mm² (Iz 15.5 A) | 10–13 A | Lighting |
| 16 A (3.7 kW) | 2.5 mm² (Iz 21 A) | 16–20 A | Sockets |
| 20 A (4.6 kW) | 2.5–4 mm² | 20–25 A | Kitchen radial |
| 25 A (5.8 kW) | 4 mm² (Iz 28 A) | 25 A | Cooker tap |
| 32 A (7.4 kW) | 6 mm² (Iz 36 A) | 32 A | Cooker / EV |
| 40 A (9.2 kW) | 10 mm² (Iz 50 A) | 40 A | Shower / feeder |
| 50 A (11.5 kW) | 10 mm² (Iz 50 A) | 50 A | Feeder |
| 63 A (14.5 kW) | 16 mm² (Iz 66 A) | 63 A | Sub-panel |
Base Iz from IEC 60364-5-52 Table B.52.2 (method C, copper, PVC). In conduit or bunched groups, derate Iz first (see our cable-size guide), then apply Ib ≤ In ≤ Iz to the derated number.
4. Full worked pass: 5.8 kW cooker circuit
Given: 5.8 kW, 230 V, cosφ = 1.0, run in trunking with one other circuit, 30 °C. Step 1 — load: Ib = 5800 / 230 = 25.2 A. Step 2 — wire: base 4 mm² Iz = 28 A; grouping ×0.80 → 28 × 0.80 = 22.4 A — fails (22.4 < 25.2). Step up: 6 mm² Iz = 36 A → 36 × 0.80 = 28.8 A — passes. Step 3 — breaker: 25.2 ≤ In ≤ 28.8 → In = 25 A or 28 A standard; common answer 25–32 A with 6 mm² (32 A needs Iz ≥ 32 — not here after derating, so 25/28 A). Final: 6 mm², 25 A breaker.
Second pass on the same cooker job, metric cross-check: the 6 mm² answer converts to roughly 10 AWG (5.26 mm² is slightly smaller, 8 AWG / 8.37 mm² slightly larger). Under NEC rules the same 25.2 A load in conduit needs 10 AWG copper minimum (35 A at 75 °C, capped at 30 A by 240.4(D)), derated for two circuits: 35 × 0.80 = 28 A ≥ 25.2 A — a 25 A breaker fits. Both systems converge on the same hardware: ~6 mm²-class copper with a 25 A-class breaker. When a panel schedule crosses the Atlantic, write both designations (6 mm² / 10 AWG) so nobody re-derives it wrong.
5. Breaker curves B, C, D
Curves set the magnetic (instant) trip as multiples of In, per IEC 60898-1 / EN 60898 / BS EN 60898: B: 3–5× (lighting, long cable runs, lighting in homes), C: 5–10× (general sockets, small motors — the default), D: 10–20× (transformers, big motors, welding). Thermal (overload) trip is the same shape across curves.
Worked check: C16 on a socket ring — magnetic band 80–160 A. A measured loop impedance Zs = 1.2 Ω gives prospective fault ≈ 230/1.2 = 192 A — inside the band, trips instantly. B16 (48–80 A) trips sooner on long runs with low fault current; D16 (160–320 A) would need 320 A guaranteed — wrong for sockets.
6. When the table answer changes
Long runs: a 25 A load that needs 4 mm² thermally may need 6 mm² for voltage drop or for low fault current (B curve instead of C). Hot rooms and grouping: derate Iz first, then re-enter the table. Motors: size the breaker for starting current per curve D and protect overload separately (contactor + overload relay or motor-protective switch).
7. RCD pairing (30 mA sockets, 100–300 mA incomer)
Socket and wet-area circuits get 30 mA RCD/RCBO (NEC GFCI equivalents, IEC 60364-4-41, BS 7671 411.3.3). Upstream incomer 100–300 mA selective (type S) for fire protection. Keep the 3× selectivity step between series RCDs (upstream ≥ 3× downstream per IEC 61008/61009 application guidance).
8. Common mistakes
- Breaker bigger than the wire. 32 A on 2.5 mm² (Iz 21 A) — the cable burns before the breaker trips.
- Forgetting 125% on continuous loads. EV charger at 100% sizing overheats the breaker over hours.
- C curve everywhere. Long lighting runs need B; big inrush needs D.
- Sizing from the breaker backwards. Start from load, not from a spare breaker in the box.
- No derating. The table value is for reference conditions — conduit and heat change it.
9. Checklist
- Ib computed with correct voltage and cosφ.
- Continuous × 1.25 applied.
- Iz derated for method, grouping, temperature.
- Ib ≤ In ≤ Iz holds on the derated Iz.
- Curve matched to load (B lighting / C general / D inrush).
- RCD pairing and selectivity checked.
10. Worked example 2: long lighting run — B or C?
Given: 2.0 kW lighting, 230 V, cosφ = 0.95, 45 m run on 1.5 mm² copper. Load: Ib = 2000 / (230 × 0.95) = 9.2 A. Cable base Iz = 15.5 A (method C) — thermally a 10 A breaker fits (9.2 ≤ 10 ≤ 15.5). Fault check: loop roughly R = 0.0175 × 90 / 1.5 = 1.05 Ω plus supply impedance ≈ 0.3 Ω → Zs ≈ 1.35 Ω, prospective fault ≈ 230 / 1.35 = 170 A. C10 magnetic band is 50–100 A: 170 A trips it instantly — C10 works. But add one more 20 m extension (Zs ≈ 1.8 Ω, fault ≈ 128 A): still inside C10 band, yet margin thins; at Zs ≈ 2.5 Ω (fault 92 A) the C10 may sit in its thermal zone (seconds, not milliseconds) while a B10 (30–50 A band) still trips instantly. Answer: B10 for long lighting runs, C10 for short ones — same load, same cable, different curve by distance. This is the calculation behind the rule of thumb electricians quote without showing.
11. Worked example 3: motor starting current vs cable
Given: 3 kW single-phase motor, 230 V, cosφ = 0.80, starting current 6× running. Running: Ib = 3000 / (230 × 0.80) = 16.3 A. Cable: 2.5 mm² Iz = 21 A — fits running current with a 20 A frame. Starting: 16.3 × 6 = 97.8 A for ~2 seconds. A C20 (magnetic 100–200 A) sits right at the edge — may hold, may nuisance-trip on a cold morning. A D20 (200–400 A) ignores the start cleanly. Overload protection must then come from a separate overload relay or motor-protective switch set at ~17 A — the D breaker alone will not protect the winding against a slow overload (its thermal element follows the same curve shape, sized for the cable, not the motor). Final: 2.5 mm² + D20 + overload relay at 17 A, or a motor-protective switch with adjustable thermal element. Never solve motor starting by upsizing the breaker alone without checking the cable still satisfies Ib ≤ In ≤ Iz.
12. Selectivity: why the main must wait its turn
Two breakers in series must coordinate: the downstream one trips first on a branch fault, the main stays on. Practical rules: keep at least one to two standard steps between series ratings (e.g. branch 16 A → sub-main 40 A → main 63 A), use selective (type S) RCDs upstream of 30 mA downstream ones with the 3× current step, and check time-current curves overlap for large faults — two C breakers one step apart may both trip on a dead short, which is acceptable in homes but not in workshops with standby loads. ΔCheck the incomer separately: a 63 A main with 25 kA breaking capacity covers most residential fault levels (typically 3–10 kA prospective); verify against the measured or utility-declared fault current, not by habit. Record the coordination pair on the panel schedule (for example C16 branch / C40 sub / C63 main) so the next electrician does not “upgrade” the branch past the sub-main.
See also
Do the pass on your panel in one place: open the free demo — load, wire, and breaker are checked together.
Try it on your own plan — open the free demo at https://gorkycad.com/cad/?demo=1, no registration needed.
Frequently asked questions
What size breaker do I need for 25 amps?
Pick In between load and derated cable capacity (Ib ≤ In ≤ Iz). For a 25.2 A cooker circuit on derated 6 mm² (Iz 28.8 A), a 25 A breaker fits. Never put a 32 A breaker on cable rated below 32 A.
What is the 1.25 rule for breakers?
NEC 210.19(A)(1)/210.20(A): continuous loads (3+ hours) need conductors and breakers sized at 125% of load current. A 20 A continuous load needs ≥25 A rated conductor and protection.
Should I use a B, C, or D curve breaker?
Per IEC 60898-1: B (3–5×) for lighting and long runs, C (5–10×) for general sockets and small motors, D (10–20×) for high-inrush equipment. Match the curve to inrush and fault current, not habit.
Can I put a bigger breaker to stop nuisance tripping?
No — upsize only if Ib ≤ In ≤ Iz still holds on derated cable. Nuisance tripping usually means overload, wrong curve, or a fault; a bigger breaker hides the symptom and risks the cable.
Do socket circuits need RCD protection?
Yes — 30 mA protection on socket and wet-area circuits (IEC 60364-4-41 / BS 7671 411.3.3; GFCI equivalents under NEC), with a selective upstream device for fire protection.