A panel schedule is the table that proves a distribution board was engineered, not just assembled. For every circuit it lists the load, current, breaker, cable, and phase. Inspectors read it before they look at the wiring, because arithmetic errors show up here first: an overloaded phase, a breaker larger than the cable it protects, or a board with no spare ways.

This guide gives you a complete panel schedule template, explains each column, works through a 12-circuit example with real numbers, and lists exactly what inspectors check. It follows IEC 60364 and NEC practice side by side, so the same template works for 230 V and 120/240 V projects with small adaptations.

1. What a panel schedule is and why it matters

A panel schedule (also called a circuit directory or distribution board schedule) is a row-per-circuit table for one board. Typical columns: circuit number, load description, location, voltage and phases, connected load in kW or VA, demand factor, design current, breaker rating and curve, RCD association, cable type and size, installation method, route length, and phase connection. The footer carries totals per phase and the board rating.

Its job is coordination made visible. Anyone must be able to trace each row and confirm that the breaker protects the cable, the phase loads balance, and the board total stays within the main breaker and enclosure rating. Electricians use it to pull and terminate the right cables. Inspectors use it to verify the design without opening every calculation. Owners use it years later to find which breaker feeds the garage sockets.

2. The template: every column explained

Circuit ID (Q1, Q2) must match the single line diagram and the physical labels in the board — identical designations everywhere, no exceptions. Load description names the load and location: bedrooms sockets, kitchen worktop sockets, cooker, water heater. Connected load is the nameplate rating. Demand factor reflects realistic simultaneity: 1.0 for a cooker, 0.5 to 0.7 for general socket groups, 0.8 to 1.0 for fixed heating.

Design current Ib is computed from power, voltage, and power factor. Breaker rating In with trip curve (B for lighting and electronics, C for general use, D for motors with high inrush) must satisfy Ib <= In. Cable size with installation method must satisfy In <= Iz after derating. Phase (L1/L2/L3) is marked on every single-phase row. RCD column names the upstream residual current device and its rating, for example 40 A / 30 mA type A.

CircuitLoadIb (A)BreakerCable (sq mm)
Q1-Q3Lighting 0.6 kW x32.7 eachB101.5
Q4-Q7Sockets 2.0 kW x44.6 eachC162.5
Q8Cooker 7.2 kW25.0C326
Q9-Q12Oven/heater/washer/AC7.0-10.4C162.5

3. Worked example: 12-circuit board for a flat

Consider a 90 sq m flat, 230 V single-phase supply for simplicity (the three-phase version follows in section 5). Twelve circuits: three lighting at 0.6 kW each, four socket groups at 2.0 kW each, cooker 7.2 kW, oven 3.0 kW, water heater 2.0 kW, washing machine 2.2 kW, air conditioner 2.5 kW. Connected total is 24.7 kW. Apply demand factors: lighting 1.0, sockets 0.5, cooker 0.8, oven 0.8, heater 1.0, washer 0.7, air conditioner 0.8.

Design currents at cos phi 0.95 for mixed loads (1.0 for heating): lighting 600 / (230 x 0.95) = 2.7 A each; socket group 2000 x 0.5 = 1000 W effective, 1000 / 218.5 = 4.6 A each; cooker 7200 x 0.8 = 5760 W, 5760 / 230 = 25.0 A; oven 3000 x 0.8 = 2400 W, 2400 / 230 = 10.4 A; heater 2000 / 230 = 8.7 A; washer 2200 x 0.7 = 1540 W, 1540 / 218.5 = 7.0 A; air conditioner 2500 x 0.8 = 2000 W, 2000 / (230 x 0.9) = 9.7 A. Breakers: lighting B10, sockets C16, cooker C32, oven C16, heater C16, washer C16 with 30 mA RCD, air conditioner C16 with 30 mA RCD.

4. Cable sizing for each row

Lighting 2.7 A on B10: 1.5 sq mm copper (method B1, 15.5 A tabulated) is ample; voltage drop governs on long runs, not ampacity. Socket groups 4.6 A on C16: 2.5 sq mm (24 A tabulated in B1) with grouping factor 0.65 for four circuits gives 15.6 A effective — just below 16 A, so split into two conduits or use 4 sq mm where four circuits share one trunk. Cooker 25.0 A on C32: 6 sq mm gives 32 A in B1, coordination 25.0 <= 32 <= 32 holds exactly; many designers use 10 sq mm for margin.

Oven 10.4 A on C16: 2.5 sq mm is fine (24 A tabulated). Heater 8.7 A on C16: 2.5 sq mm. Washer 7.0 A on C16 with RCD: 2.5 sq mm. Air conditioner 9.7 A on C16: 2.5 sq mm, or 4 sq mm for runs over 25 m to control voltage drop below 3 percent for the motor start. Record the installation method per row, because the same 2.5 sq mm carries 24 A in conduit on a wall but only about 18.5 A surrounded by thermal insulation (method A1 with correction).

PhaseCircuitsTotal (A)Share
L1Cooker + 2 socket groups34.236 percent
L2Oven + heater + lighting24.526 percent
L3Sockets + washer + AC28.630 percent
Main40 A 3-phase34 maxUnbalance 8 percent

5. Phase balancing on three-phase boards

On a 400 V three-phase board, distribute single-phase circuits so the per-phase currents differ by no more than about 15 percent. List each circuit with its phase, sum the design currents per phase, and compare. Example: L1 total 38 A, L2 total 35 A, L3 total 36 A. Unbalance is (38 - 35) / 38 = 7.9 percent — acceptable. If L1 showed 48 A against L2 at 30 A, move one socket circuit from L1 to L2 and recompute.

Mark the neutral current estimate as well. With linear loads the neutral carries only unbalance current, but with heavy LED and electronic loads triplen harmonics add up in the neutral — size it at least equal to the phase conductors and consider oversizing on office and retail boards. Note the earthing system (TN-S, TN-C-S, or TT) in the schedule header, because RCD selection and earth conductor sizing depend on it.

6. The 20 to 30 percent spare rule

Every board needs spare capacity in three dimensions: spare ways (empty module positions), spare current rating, and spare physical space for one future cable per section. The practical rule: design load should not exceed 70 to 80 percent of the board rating, and at least 20 percent of ways should remain free. A 24-way board with 19 used ways and a 63 A main loaded to 45 A meets the rule; a 12-way board with 12 used ways does not, even if currents fit today.

State the spare explicitly in the footer: installed 19 of 24 ways, design load 45 A of 63 A, spare 5 ways and 18 A. This single line prevents the most common retrofit failure — a heat pump added two years later with nowhere to land except a overloaded sub-board. Inspectors in several jurisdictions now ask for the spare statement directly.

7. Full 12-circuit schedule with numbers

Assembled footer for the flat example: total effective load is lighting 1.8 kW plus sockets 4.0 kW plus cooker 5.76 plus oven 2.4 plus heater 2.0 plus washer 1.54 plus air conditioner 2.0 = 19.5 kW effective. At 230 V and blended cos phi 0.95 the service current is 19500 / 218.5 = 89.2 A, which exceeds a typical 63 A flat service — so this flat realistically needs either a three-phase supply or load management (the cooker and heater interlocked, or a smaller agreed load). That is exactly the insight a schedule delivers before copper is bought.

Split across three phases for a house version: assign cooker and two socket groups to L1 (25.0 + 4.6 + 4.6 = 34.2 A at mixed power factors, roughly 33 A effective), oven plus heater plus lighting to L2 (10.4 + 8.7 + 2.7 + 2.7 = 24.5 A), remaining sockets plus washer plus air conditioner plus lighting to L3 (4.6 + 4.6 + 7.0 + 9.7 + 2.7 = 28.6 A). Heaviest phase 34 A against a 40 A three-phase main: balanced and within rating with one spare way per phase section.

8. What inspectors actually check

Inspectors work down a short list. Designations match between schedule, SLD, and board labels. Every breaker has a cable size that satisfies In <= Iz with the stated installation method. RCD coverage is complete for sockets, bathrooms, and outdoor circuits, with an upstream selective device. Phase totals are shown and balanced. The board rating exceeds the summed design load with visible spare. Earthing conductors and main bonding are listed with sizes per IEC 60364-5-54 or NEC 250.66.

Documentation checks: title block with address and revision, designer identification where required, and dates consistent across SLD, schedule, and cable schedule. Arithmetic spot-checks: the inspector recomputes two or three rows by hand. If Ib, In, and Iz do not reconcile on the sampled rows, the whole package goes back. Generate all three documents from one model and this class of rejection disappears.

9. Mini-case: restaurant board that kept tripping

A small restaurant ran a 400 V board with 18 circuits: kitchen sockets, two ovens, dishwasher, HVAC, lighting, and tills. The main was 63 A but nuisance-tripped at lunch rush. The schedule showed why: L2 carried both ovens plus the dishwasher (41 A on a 40 A phase section), while L3 carried only lighting and tills (14 A). Moving the dishwasher circuit to L3 cut L2 to 29 A and raised L3 to 26 A — unbalance under 15 percent, trips stopped, no new cable pulled. The fix took one hour because the schedule made the imbalance undeniable.

10. Assumptions and limits of this template

Assumes copper conductors, PVC/XLPE insulation, 30 C ambient, standard IEC breaker ranges, TN earthing, and linear or mildly non-linear loads. Ampacity figures cited are for installation method B1 (conduit in wall); other methods need their own columns from IEC 60364-5-52 Table B.52.2 or NEC 310.16 with adjustment factors. Demand factors are engineering estimates — verify against local utility rules for service sizing.

Does not cover motor starting studies, harmonic analysis, arc-flash labelling, hazardous areas, or medical locations. Those need specialist schedules appended to the same board format. When in doubt, add a row rather than hiding a load in another circuit — hidden loads are how boards end up 30 percent over rating with a clean-looking schedule.

11. From template to generated schedule

Copy the column set into a spreadsheet for a one-off board, but for anything above 12 circuits use a generator: enter loads once, and the schedule, SLD, cable list, and totals come out consistent. The generator enforces designation matching, recomputes Ib on every edit, flags In > Iz instantly, and keeps phase totals live. Print the result, walk the site with it, and mark any deviation in red — that marked-up print becomes the as-built record. Keep the digital model as the single source so the next extension starts from truth, not from memory.

Generate a balanced panel schedule in minutes — try the free demo at https://gorkycad.com/cad/?demo=1 and export it with your single line diagram.

Frequently asked questions

How many circuits fit on one panel schedule page?

As many as fit legibly — typically 12 to 24 rows per A4/A3 sheet. Beyond that split by board or by floor and cross-reference. One board, one schedule; never merge two boards into one table.

Do lighting circuits need RCD protection?

Indoor lighting generally not under IEC, but bathrooms, outdoor lighting, and TT systems require 30 mA protection. Several national amendments extend this — check BS 7671 or your local wiring rules for the installation location.

What trip curve should socket circuits use?

Curve C for general socket circuits, curve B for lighting and sensitive electronics, curve D for motors with high inrush. The curve must appear in the schedule, not just the ampere rating.

How do I show spare capacity in the schedule?

Add a footer line: used ways versus total ways, design current versus board rating, and reserved ways for future circuits. Example: 19/24 ways used, 45/63 A loaded, 5 ways spare.

Can software generate the schedule from the floor plan?

Yes. Define circuits on the plan with loads attached, and the tool tabulates currents, breakers, cables, and phases automatically. Verify two rows by hand — if they reconcile, the rest follows from the same calculation.

Related reading