If you run a two-person electrical shop, estimating is not paperwork. It is survival. One underpriced house rewiring wipes out the profit of three good jobs. One overpriced bid means two idle weeks. In 2026 the tools have not changed the math, but they changed the speed: the shop that produces an accurate bill of materials in one evening beats the shop that re-types Excel rows for three nights.
This guide is written for owner-operators: you measure, you pull cable, you sign the bid. We compare the three realistic approaches, show what a mistake costs in numbers, and give you a checklist you can use this week.
1. What a small shop actually needs from estimating
You do not need enterprise features. You need five things: fast takeoff from a floor plan, correct wire and breaker sizing, a bill of materials that matches the drawing, labour hours you believe, and a quote you can defend to the customer. Everything else is decoration. Most shops lose money not on cable price but on forgotten items: boxes, glands, fasteners, patch panels, grounding electrodes, and return trips.
Write down your last three jobs and mark where the estimate broke. In our experience reviewing small-contractor bids, the pattern repeats: materials underestimated by 8 to 15 percent, labour by 20 to 30 percent, and one missing scope item per bid on average.
2. The three approaches: Excel, SaaS, CAD built-in
Excel is free and flexible, but every number is typed by hand and nothing checks you. SaaS estimators give you assemblies and price books, but you still redraw the plan elsewhere and re-type quantities. CAD built-in estimating generates the bill of materials from the drawing itself: move a socket on the plan and the cable length, box count, and breaker schedule update together.
For a two-person shop the deciding factor is rework. If you change the panel location after the customer calls, Excel means an evening of corrections. A model-based tool means one move and a regenerated list.
| Approach | Takeoff | Error checking | Rework after change | Typical cost |
|---|---|---|---|---|
| Excel / sheets | Manual | None | Full re-type | Free, slow |
| SaaS estimator | Assemblies | Price-book only | Partial | Subscription per seat |
| CAD built-in | From drawing | Code rules + cross-checks | Regenerate list | Subscription, one tool |
3. The cost of one bad bid, in numbers
Take a typical 100 sq m house rewiring. Materials around 4,000 to 6,000 USD equivalent depending on region, labour roughly the same again. A 10 percent material miss is 400 to 600 in your pocket. Two forgotten return trips at half a day each cost another 200 to 400 in lost billable time.
Worked example. Say your true cost is 9,200: materials 4,800, labour 3,600, overhead and trips 800. You bid 9,000 because the spreadsheet dropped 60 m of 3x2.5 cable and 8 boxes. Cable at 1.8 per metre is 108, boxes and consumables 90, extra trip 150. Your margin of 800 planned profit becomes roughly 450. One such job per quarter costs you about 1,400 a year, more than any software subscription.
4. Takeoff: points, metres, panel, grounding
Use the same four-bucket method every time so bids are comparable. Bucket one: points, meaning every socket, switch, light, and fixed load with its circuit. Bucket two: metres of cable per circuit, measured along real routes, not straight lines on paper. Bucket three: panel, meaning breakers, RCDs, enclosure, busbars, and spare ways. Bucket four: grounding and bonding, electrodes, conductors, clamps.
Rule of thumb for sanity: cable metres per point in a house usually land between 6 and 10 m. If your takeoff says 3 m per point, you forgot routes. If it says 15, you double-counted or routed everything home-run.
| Bucket | What to count | Typical share of materials |
|---|---|---|
| Points | Sockets, switches, lights, fixed loads | 25 to 35 percent |
| Metres | Cable by cross-section, conduit, trunking | 30 to 40 percent |
| Panel | Breakers, RCDs, enclosure, SPD | 20 to 30 percent |
| Grounding | Electrodes, GEC, clamps, bonding | 3 to 8 percent |
5. Sizing the two things that burn you
Breaker-to-wire matching and voltage drop cause most callbacks. Size the breaker to protect the wire, not the load wish: a 16 A breaker on 2.5 sq mm copper is the workhorse of socket circuits under IEC 60364-4-43 and NEC 240.4. For long runs check drop: at 3 percent for lighting and 5 percent overall per IEC 60364-5-52, a 25 m run of 2.5 sq mm at 16 A and 230 V drops about 2.7 percent, calculated as dV equals 2 times rho times L times I divided by S, with rho 0.0175 ohm sq mm per m. That is 2 times 0.0175 times 25 times 16 divided by 2.5, giving 5.6 V, which is 2.4 percent of 230 V. Close to the limit, so upsize or split the circuit.
Document the two numbers on the bid: breaker rating and wire size per circuit. If a competitor bids lower with the same breaker on thinner wire, that is not a better price, it is a code violation per NEC 310.16 ampacity tables.
6. Labour: the half everyone underprices
Materials have receipts, labour has optimism. Track three numbers per point type: first-fix minutes, second-fix minutes, and testing minutes. A socket point might be 45 minutes first fix plus 20 minutes second fix in masonry. Twenty sockets is then about 22 hours before you touch the panel.
Add panel build hours separately: 6 to 10 hours for a 24-way residential board with RCDs and labelling. Add commissioning: insulation resistance, continuity, RCD trip tests per IEC 60364-6. Never fold testing into zero, inspectors and callbacks will find it.
7. Mini-case: two electricians, one duplex, one evening
A two-person shop in Ohio bid a duplex rewire: 38 points, panel replacement, two kitchens. Old method: two evenings of Excel, bid 14,200. They re-ran it in a CAD tool with a drawn plan: the model counted 41 points because three hallway lights and a doorbell transformer were missing from the walkthrough notes, and cable came to 412 m instead of guessed 320 m, with two extra junction boxes the first count had missed entirely. The corrected bid was 15,100. They won the job anyway because the itemised list looked professional, and finished 60 USD under the material budget. The lesson was not the software brand, it was that the drawing caught what memory dropped.
8. Checklist before you buy any estimating tool
Run every candidate through the same ten checks on a real past job. Import or redraw one floor plan. Count points automatically. Change one circuit route and see if lengths update. Generate the bill of materials and compare line by line with your old spreadsheet. Check that breaker suggestions cite a rule such as NEC 210.8 for GFCI or IEC 60364-4-41 for disconnection. Export a PDF the customer can read. Time the whole cycle. If it is not faster than Excel on the second job, walk away.
- Takeoff from the plan, not re-typed
- Wire and breaker suggestions with rule references
- One-click regeneration after plan changes
- Labour library you can edit per point type
- Customer-ready PDF export
- Works for your code: NEC or IEC 60364 or BS 7671
- Price in your currency, exportable data
9. Assumptions and when this does not apply
These ranges assume residential and light commercial work up to about 200 A services. They do not apply to hazardous locations, hospitals, or medium-voltage work, which need specialist engineering. Prices in this article are ranges for 2026 and vary widely by region, copper price, and supplier; treat them as planning bands, not quotes. Labour rates assume licensed electricians in metro areas; rural or union markets differ. If your jobs are mostly service calls under half a day, a full estimating suite is overkill and a flat-rate price book serves you better.
10. Reading a competitor quote in ten minutes
Ask for four lines: points count, cable metres by size, panel schedule with breaker ratings, and grounding scope. If any line is missing, the bid is not comparable. Divide materials by points: under 80 per point in 2026 usually means something is missing or undersized. Check that RCD or GFCI protection is listed per NEC 210.8 or IEC 60364-4-41; its absence is a red flag, not a saving. Finally, look for spare ways in the panel, at least 20 percent. A full panel on day one is a change order on day thirty.
One more habit separates profitable shops from busy ones: review every lost bid for one month. Note whether you lost on price, on scope clarity, or on response time. Shops that track this usually find that faster, clearer bids win more work than cheaper bids. A customer who sees every circuit, breaker size, and metre of cable trusts the number, even when it is not the lowest.
Try it on your next bid: draw the plan once and generate the list from it at https://gorkycad.com/cad/?demo=1 with the free demo, no signup needed. If the generated list finds even one forgotten circuit, the method has paid for itself.
Draw one plan and generate the estimate from it: free demo at https://gorkycad.com/cad/?demo=1, no signup needed.
Frequently asked questions
Do I need estimating software for two people?
Not always. If most jobs are half-day service calls, a flat-rate price book is enough. Software pays off when you bid whole houses or shops with 20-plus points, where one forgotten circuit costs more than a monthly subscription.
Excel vs SaaS estimator, which is more accurate?
Neither is accurate by itself. Accuracy comes from the takeoff method. A tool that generates quantities from the drawing beats both, because plan changes regenerate the list instead of relying on you to re-type every row.
How much does a bad bid really cost?
On a typical house rewiring, a 10 percent material miss plus two extra trips easily costs 400 to 700. One such job per quarter exceeds the yearly cost of most estimating subscriptions.
Which code should the tool support?
The one you work under: NEC Article 220 and 310.16 in the US, IEC 60364 internationally, BS 7671 in the UK. Breaker and RCD suggestions should cite the rule, for example GFCI protection per NEC 210.8.
Can I try model-based estimating free?
Yes. Draw the plan once in the free demo at https://gorkycad.com/cad/?demo=1 and generate the bill of materials from it. Compare the list line by line with your last spreadsheet bid.