Every electrical sizing task starts with one conversion: kilowatts to amps. The breaker, the cable, and the phase balance all follow from that single number. Get it wrong and everything downstream is wrong: an undersized breaker trips on normal load, an oversized one fails to protect the cable.

This guide gives the three formulas (single-phase AC, three-phase AC, DC), explains power factor with real values, provides a full 1 to 100 kW table, covers 230 V versus 400 V versus 415 V systems, and shows how to step from current to breaker rating. Every number below is computed in front of you — no hidden tables.

1. The three formulas (memorize these)

Single-phase AC: I = P / (U x cos phi). Three-phase AC: I = P / (sqrt(3) x U x cos phi). DC: I = P / U. Here P is power in watts, U is voltage in volts (230 V single-phase, 400 V three-phase line-to-line), cos phi is the power factor for AC, and sqrt(3) = 1.732 accounts for three phases sharing the load. DC has no power factor and no root-three because there is one voltage and no phase shift.

Units matter: convert kW to W first (multiply by 1000). A 7.2 kW cooker is 7200 W in the formula. Mixing kW with volts directly is the most common arithmetic error and it understates current by a factor of 1000 — always convert first.

2. Power factor: 1.0, 0.9, and 0.8 in practice

Resistive loads (heaters, cookers, incandescent lamps) have cos phi = 1.0: current follows power directly. Mixed domestic loads average about 0.9 to 0.95. Motors and fluorescent gear run 0.7 to 0.85. The lower the power factor, the higher the current for the same kilowatts, because part of the current only magnetizes the load without doing work.

Example at 10 kW three-phase 400 V: at cos phi 1.0, I = 10000 / (1.732 x 400 x 1.0) = 10000 / 692.8 = 14.4 A. At 0.9: 10000 / 623.5 = 16.0 A. At 0.8: 10000 / 554.2 = 18.0 A. Same power, 25 percent more current from 1.0 to 0.8. When the power factor is unknown, use 0.9 for mixed loads and 0.8 for motor loads — never assume 1.0 for anything with a motor.

kW1-ph 230 V (A)3-ph 400 V (A)Breaker 3-ph
313.74.8C10
7.534.312.0C16
1568.624.1C32
30137.348.1C50

3. Worked calculation: 15 kW workshop, three cases

Case A, three-phase 400 V, cos phi 0.85: I = 15000 / (1.732 x 400 x 0.85) = 15000 / 588.9 = 25.5 A. Next standard breaker: 32 A. Case B, single-phase 230 V, same power, cos phi 0.9: I = 15000 / (230 x 0.9) = 15000 / 207 = 72.5 A. That needs an 80 A feeder — this is why workshops above 10 kW go three-phase wherever possible. Case C, DC 48 V solar battery circuit, 3 kW: I = 3000 / 48 = 62.5 A. Low-voltage DC produces huge currents; cable size is governed by current, not power.

Notice the ratios: the same 15 kW draws 25.5 A three-phase but 72.5 A single-phase — nearly three times more. This is why utilities limit single-phase services (commonly 60 to 80 A) and require three-phase above that. If your single-phase calculation exceeds 60 A, stop and ask for a three-phase supply before sizing anything.

4. Master table: 1 to 100 kW at common voltages

All values computed from the formulas above. Three-phase at 400 V uses cos phi 0.9; single-phase at 230 V uses cos phi 0.95 for small loads; DC at 48 V has no power factor. Check any row by hand — the arithmetic is shown in the header so errors cannot hide.

Table (kW | 1-ph 230 V / A | 3-ph 400 V / A | 3-ph 415 V / A | DC 48 V / A): 1 | 4.6 | 1.6 | 1.5 | 20.8; 2 | 9.2 | 3.2 | 3.1 | 41.7; 3 | 13.7 | 4.8 | 4.6 | 62.5; 5 | 22.9 | 8.0 | 7.7 | 104.2; 7.5 | 34.3 | 12.0 | 11.6 | 156.3; 10 | 45.8 | 16.0 | 15.5 | 208.3; 15 | 68.6 | 24.1 | 23.2 | 312.5; 20 | 91.5 | 32.1 | 30.9 | 416.7; 30 | 137.3 | 48.1 | 46.4 | 625.0; 50 | 228.8 | 80.2 | 77.3 | 1041.7; 75 | 343.2 | 120.3 | 116.0 | 1562.5; 100 | 457.6 | 160.4 | 154.6 | 2083.3.

Verify one row: 20 kW three-phase 400 V at 0.9 gives 20000 / 623.5 = 32.1 A — matches. Single-phase 5 kW at 0.95: 5000 / 218.5 = 22.9 A — matches. DC 10 kW at 48 V: 10000 / 48 = 208.3 A — matches. The 415 V column (India, UK legacy) runs about 3.6 percent below 400 V values since current scales inversely with voltage.

Power factor10 kW 3-ph currentBreakerNote
1.0014.4 AC16Resistive heating
0.9016.0 AC20Mixed domestic
0.8018.0 AC20Motor loads
0.7020.6 AC25Small motors

5. Voltage systems: 230, 400, 415, 120/240 V

Europe and most of Asia: 230 V single-phase, 400 V three-phase (IEC 60038). India: 230/415 V nominal — same formulas with 415 in the denominator, giving currents about 3.6 percent lower than at 400 V. North America residential: 120/240 V split-phase; use 240 V in the single-phase formula for large appliances (dryer, range) and 120 V for general receptacle circuits.

Example: a 5 kW range at 240 V, cos phi 1.0: I = 5000 / 240 = 20.8 A, next breaker 25 or 30 A per NEC 220. At 230 V the same load draws 21.7 A — nearly identical, so breaker selection rarely changes between 230 and 240 V. But dropping from 400 V three-phase to 230 V single-phase nearly triples the current, which is why the supply system choice dominates every sizing decision.

6. From current to breaker: the selection step

Take the design current Ib and choose the next standard rating In at or above Ib: standard IEC range 6, 10, 16, 20, 25, 32, 40, 50, 63 A. A computed 24.1 A takes a 32 A breaker; 18.0 A takes 20 A; 45.8 A takes 50 A. Then verify the cable: the breaker must satisfy In <= Iz where Iz is the derated cable ampacity from NEC 310.16 or IEC 60364-5-52.

Worked check: 10 kW three-phase gives 16.0 A, breaker 20 A curve C. Cable 4 sq mm copper in conduit (B1, three loaded conductors): tabulated 24 A at 30 C, no grouping derating, so Iz = 24 A. Coordination 16.0 <= 20 <= 24 holds. Counter-example: the same 20 A breaker on 2.5 sq mm grouped with three other circuits (factor 0.65): Iz = 15.6 A, and 20 > 15.6 fails — step up to 4 sq mm or regroup. Never skip this check; the breaker table alone does not prove compliance.

7. DC and special cases

DC circuits follow I = P / U with no power factor, but voltage drop bites harder because system voltages are low. A 3 kW load at 48 V draws 62.5 A — a 70 A fuse with 16 sq mm cable. At 12 V the same power draws 250 A, which is why 12 V distribution stays short and thick. Size DC cables by both ampacity and voltage drop, and fuse at the source end.

Variable-frequency drives, welders, and EV chargers need manufacturer data on top of the formulas: harmonic content raises neutral current, and continuous loads per NEC 210.19 require sizing at 125 percent (a 32 A continuous EV load needs a 40 A circuit). When the nameplate gives current directly, use it — measured amps beat computed amps.

8. Mini-case: choosing supply for a 30 kW farm workshop

Loads: 11 kW lathe (motor, cos phi 0.82), 7.5 kW compressor (0.8), 6 kW heating (1.0), 5.5 kW mixed sockets and lighting (0.9). Per-load three-phase currents at 400 V: lathe 11000 / (1.732 x 400 x 0.82) = 11000 / 568.1 = 19.4 A; compressor 7500 / 554.2 = 13.5 A; heating 6000 / 692.8 = 8.7 A; mixed 5500 / 623.5 = 8.8 A. Total 50.4 A with diversity 0.8 gives 40.3 A design — a 50 A three-phase service with 16 sq mm supply cable. Single-phase would need 150 A, which no utility offers for this load. The table pointed at the answer in seconds; the per-load math confirmed it.

9. Assumptions and when these tables do not apply

Assumes sinusoidal AC, balanced three-phase loads, copper conductors, standard power factors as stated, and altitudes below 1000 m at 30 C ambient. Table currents are design currents Ib — breaker and cable selection must follow with coordination and derating. NEC continuous loads need the 125 percent factor applied after this conversion.

Do not use these tables for motor starting current (5 to 7 times running current), transformer inrush, circuits with heavy harmonics without neutral analysis, aluminum conductors without correction, or installations above 40 C ambient. For those, compute from nameplate data and the full standard tables, then use this guide only as a sanity check on magnitude.

10. Quick reference and next step

Bookmark three numbers: 1 kW three-phase at 400 V is about 1.6 A; 1 kW single-phase at 230 V is about 4.6 A; 1 kW at 48 V DC is about 20.8 A. Scale linearly: 25 kW three-phase is roughly 25 x 1.6 = 40 A (exact 40.1 A at 0.9). Then run the exact formula for the final answer and select breaker and cable as in section 6. Enter the same loads in the demo generator to get the full panel schedule and SLD without retyping — the arithmetic stays identical, the paperwork writes itself.

Size any load in seconds — open the free demo at https://gorkycad.com/cad/?demo=1, enter kW, and get breaker, cable, and phase balance automatically.

Frequently asked questions

What is the kW to amps formula for 3-phase?

I = P / (1.732 x U x cos phi), with P in watts and U the line-to-line voltage. Example: 15000 W at 400 V and 0.9 power factor gives 15000 / 623.5 = 24.1 A.

Why does power factor change the current?

Because part of the current magnetizes inductive loads without doing work. At the same kW, a 0.8 power factor draws 25 percent more current than 1.0. Always use the load power factor, or 0.8-0.9 as a conservative estimate.

How do I go from amps to breaker size?

Choose the next standard rating at or above the design current, then verify the cable: Ib <= In <= Iz with derating applied. Example: 24.1 A takes a 32 A breaker with cable ampacity at least 32 A.

Is 415 V different from 400 V in the calculation?

Only by 3.6 percent — use 415 in the denominator for Indian systems. Breaker selection almost never changes between the two, but phase balance and cable checks still apply.

Can I use one table for DC loads?

No. DC uses I = P / U with no power factor, and currents are much larger at low voltages. A 3 kW load at 48 V draws 62.5 A. Size DC cables by both ampacity and voltage drop.