Low power factor is a tax you pay twice: once in oversized transformers, cables, and generators, and once in utility penalties for reactive power. Power factor correction (PFC) — usually capacitor banks — supplies reactive power locally so the grid does not have to. Done right, it pays back in months. Done wrong, it causes resonance, overvoltage, and blown capacitors.

This article shows how to calculate the required kVAr, before/after tables, where to connect compensation, the resonance risk, and a full workshop example. Formulas follow IEC 60364 and standard power-triangle math.

1. What Correction Actually Does

An induction motor draws magnetizing current that does no work but still flows through your cables and transformer. Capacitors draw the opposite (leading) current, which cancels part of the motor's lagging current at the point of connection. The supply then carries less total current for the same useful power — smaller losses, smaller voltage drop, freed transformer capacity.

Correction is measured in kVAr (kilovars). It does not change the motor's own power factor — the motor still draws the same current — but everything upstream of the capacitors sees a cleaner, smaller current. That is why placement matters as much as size.

2. The Sizing Formula

Required compensation: Qc = P × (tan φ1 − tan φ2), where P is real power in kW, φ1 the current angle, φ2 the target angle. Step by step: take present PF (cos φ1), look up tan φ1; take target PF (cos φ2), look up tan φ2; multiply the difference by P.

Worked example: P = 150 kW, present cos φ1 = 0.75 (tan = 0.882), target cos φ2 = 0.95 (tan = 0.329). Qc = 150 × (0.882 − 0.329) = 150 × 0.553 = 82.9 kVAr → standard size 100 kVAr in steps. New apparent power: 150 / 0.95 = 157.9 kVA instead of 150 / 0.75 = 200 kVA — a 42 kVA release of supply capacity.

3. Before/After Table (150 kW Workshop)

QuantityBefore (PF 0.75)After (PF 0.95)
Apparent power200 kVA157.9 kVA
Line current at 400 V288.7 A227.9 A
Reactive power drawn132.3 kVAr49.3 kVAr
Capacitors installed—100 kVAr stepped
Cable losses (∝ I²)100%62%

Current check: I = S / (√3 × U) = 200,000 / (1.732 × 400) = 288.7 A before; 157,900 / 692.8 = 227.9 A after. Losses fall with the square of current: (227.9/288.7)² = 0.623 — a 38 % loss reduction in the supply cables.

4. How Big: Quick kVAr Table per 100 kW

From \ To0.900.920.950.98
0.7054606982
0.7540465568
0.8027324255
0.8514192942

Values are kVAr per 100 kW of load. Example: 200 kW at 0.80 corrected to 0.95 needs 2 × 42 = 84 kVAr. Do not target 1.00 — slightly leading power factor at light load causes overvoltage and utility complaints; 0.95 lagging is the standard target.

5. Where to Connect: Three Levels

Individual compensation (capacitor at each large motor) unloads the maximum cable length and handles intermittent loads precisely, but costs the most per kVAr. Group compensation (one bank per distribution board or workshop section) is the usual sweet spot: stepped contactors follow the load. Central compensation (one automatic bank at the main board) is cheapest and fixes the utility bill, but internal cables stay fully loaded.

Rule of thumb: motors above 30–50 kW that run long hours get individual units; sections with mixed small motors get group banks; the main incomer gets an automatic stepped bank covering the base load. Never connect unswitched capacitors to a circuit with standby generators unless the set is rated for leading load.

6. Resonance: The Risk That Destroys Capacitors

Capacitors and the supply inductance form a resonant circuit. If its frequency lands on a harmonic produced by VFDs, welders, or UPS units (usually the 5th or 7th, i.e. 250/350 Hz), currents multiply and capacitors fail — sometimes violently. This is not rare: it is the number-one cause of dead PFC banks in plants with drives.

Protection: detuning reactors (typically 7 % or 14 %, shifting resonance below the 5th harmonic) in series with every step wherever nonlinear loads exceed roughly 15–20 % of transformer rating. Measure harmonics before sizing when drives are present — a power quality analyzer day costs less than one replacement bank.

7. Mini-Case: Machine Shop Pays Back in 7 Months

A shop runs 150 kW at PF 0.75, pays a reactive-energy penalty of about 900 currency units a month, and its 250 kVA transformer runs at 80 % with no room for a new CNC machine. A 100 kVAr automatic bank with detuning reactors costs roughly 6,000 installed. New PF 0.95: penalty drops to near zero, transformer loading falls to 63 %, the CNC machine connects without a transformer upgrade worth 25,000. Payback on penalties alone: about 7 months; counting the avoided transformer, it is immediate.

8. Control: Steps, Controller and Settings

An automatic bank switches capacitor steps to track the load — typical steps 12.5/25/50 kVAr with a controller measuring cos φ at the incomer. Set the target to 0.95 lagging, switching delay 10–30 s to avoid hunting on intermittent loads, and discharge time so a step cannot reconnect while still charged (reconnecting a charged capacitor to opposite phase is a classic failure). Leave one spare step for growth.

9. Assumptions / When This Doesn't Apply

This sizing assumes roughly sinusoidal loads where displacement power factor dominates. Reconsider when: (1) harmonics dominate (large VFD/UPS share) — you need detuned or active filtering, not plain capacitors; (2) the load is mostly resistive or LED — little to correct; (3) standby generators run often — leading PF can destabilize small sets, coordinate with the generator vendor; (4) voltage is already high at light load — fixed capacitors will push it higher; (5) the tariff has no reactive component — correction still helps losses and capacity, but payback stretches to years.

10. Commissioning and Maintenance Checks

After installation, verify with the controller readings and a clamp meter: PF at the incomer 0.92–0.97 lagging across the working day, no leading PF at night or weekends (switch steps off or use fewer fixed steps), capacitor currents balanced across phases, cabinet temperature normal, no swelling or leaking cans. Re-check yearly: capacitance drifts down with age, and a bank that silently lost half its steps is worse than none because the bill returns while everyone assumes it is fixed.

11. Penalties and Tariff Logic

Most industrial tariffs in IEC-system countries charge for reactive energy above a threshold (often tan φ above 0.4–0.5, i.e. PF below ~0.9) or for exceeding contracted kVA demand. Correcting to 0.95 removes the penalty line from the bill and can reduce contracted demand. Homes are not penalized this way — PFC belongs to commercial and industrial boards, not to flats.

12. Putting It in the Design File

Record the compensation in the single-line diagram (bank location, steps, detuning, controller settings) and in the load schedule (PF before/after per section). When anyone later adds a VFD or a new machine, the file shows exactly which steps cover it — and whether the resonance study needs repeating.

Appendix: Standard Bank Steps and Placement Guide

Capacitor banks come in standard steps that the controller switches in and out. The step size should be smaller than your smallest load swing — otherwise the controller hunts, switching a step on and off every minute, which kills contactors. A 100 kVAr bank built as 4 × 25 kVAr follows a 30 kW load swing smoothly; the same 100 kVAr as 1 × 100 fixed would overcompensate half the day.

Bank totalStepsBest for
50 kVAr2 × 25Small workshop, one shift
100 kVAr4 × 25150 kW shop from the example
200 kVAr8 × 25 or 4 × 50Factory section, mixed loads
400 kVAr8 × 50 detunedPlant with VFDs (reactors mandatory)

Two placement errors account for most underperforming banks. First, current transformers for the controller installed around the wrong busbar — the controller then measures only part of the load and the bank stands idle while penalties accrue. Second, fixed (unswitched) steps left connected at night when only lighting runs: the site exports leading reactive power, voltage rises, and the utility complains from the other direction. Commissioning must include a full-day log at the incomer with the bank in automatic mode, plus a night reading to confirm no leading PF.

One more field note: take the utility's definition of the billing window before promising payback. Some tariffs average power factor over the month, others penalize the worst 15-minute interval — a single uncompensated Monday morning can set the whole month's charge. Log interval data for two weeks pre-installation so the savings calculation survives the customer's accountant.

Draw the workshop once and test compensation scenarios: https://gorkycad.com/cad/?demo=1&lang=en — load schedule, single-line, and cable checks update together.

Model it before you buy capacitors: open the free demo at https://gorkycad.com/cad/?demo=1&lang=en — lay out the workshop, list motor loads, and export the single-line diagram with the load schedule.

Frequently asked questions

How do I calculate the capacitor size?

Qc = P × (tan φ1 − tan φ2). Example: 150 kW from PF 0.75 to 0.95 needs 150 × (0.882 − 0.329) = 82.9 kVAr → install a standard 100 kVAr stepped bank.

What target power factor should I aim for?

0.95 lagging. Do not target 1.00 — at light load the system goes leading, voltage rises, and some utilities penalize leading PF too.

Where should capacitors be installed?

Large steady motors: individually. Mixed sections: group banks per board. Whole site billing: automatic bank at the incomer. Individual unloads the most cable; central is cheapest per kVAr.

Why do PFC capacitors keep failing in plants with VFDs?

Harmonic resonance: capacitors plus supply inductance resonate near the 5th/7th harmonic from drives. Use detuning reactors (7 % or 14 %) and measure harmonics before sizing.

Does power factor correction save kWh?

No — loads consume the same kWh. It cuts kVA demand, penalties, I²R losses (about 38 % in the 150 kW example), voltage drop, and frees transformer capacity.