Transformer nameplates speak in kVA, but breakers, cables, and panels are sized in amps. Converting between the two is a two-line calculation — yet it is where most sizing mistakes start: wrong voltage in the formula, forgotten √3 on three-phase, or no margin for inrush and future load. This guide gives you both formulas, full reference tables from 5 to 1000 kVA, and a worked panel example at 400 V. How to use this guide: start with the formula for your system, read the closest table row, then work the panel example with your own numbers before buying anything. Every result here recomputes on a pocket calculator in under a minute.

The two formulas you actually need

For single-phase, current is apparent power divided by voltage: I = S / U, where S is in VA and U in volts. A 5 kVA unit at 230 V gives 5000 / 230 = 21.7 A. For three-phase, power splits across three phases: I = S / (√3 × UL-L), where UL-L is line-to-line voltage. The same 5 kVA at 400 V three-phase gives 5000 / (1.732 × 400) = 7.2 A. Always use line-to-line voltage for the three-phase form and phase voltage for the single-phase form; mixing them is the single most common error. These are steady-state full-load currents at rated voltage and unity displacement of the apparent power — real load current follows the connected load, not the nameplate.

kVA to amps table: three-phase 400 V and 415 V

The table below uses I = S / (√3 × U). Values are full-load amps, rounded to one decimal. For 415 V systems (common in the UK, Australia, and parts of Asia) currents run about 3.6% lower than at 400 V.

Rating (kVA)400 V 3-ph (A)415 V 3-ph (A)Typical use
57.27.0Small workshop
1014.413.9Small commercial
1521.720.9Shop, cafe
2536.134.8Small building
5072.269.6Office floor
75108.3104.4Workshop
100144.3139.1Commercial block
150216.5208.7Mid-size plant
200288.7278.2Factory section
300433.0417.4Industrial
500721.7695.6Large site
7501082.51043.5Substation
10001443.41391.2Substation

kVA to amps table: single-phase 230 V and split-phase 120/240 V

Single-phase currents are √3 times higher than three-phase at comparable voltage, which is why single-phase services hit cable limits fast. North American 120/240 V split-phase uses 240 V for the two-pole calculation.

Rating (kVA)230 V 1-ph (A)240 V 1-ph (A)120 V 1-ph (A)
521.720.841.7
1043.541.783.3
1565.262.5125.0
25108.7104.2208.3
37.5163.0156.3312.5
50217.4208.3416.7
75326.1312.5625.0
100434.8416.7833.3

Worked example: sizing a 400 V panel from kVA

Given: a 45 kVA connected load at 400 V three-phase, cos φ = 0.85. Step 1 — full-load current: I = 45000 / (1.732 × 400) = 45000 / 692.8 = 65.0 A. Step 2 — active power check: P = √3 × 400 × 65.0 × 0.85 = 38.3 kW. Step 3 — margin 25%: 65.0 × 1.25 = 81.2 A → next standard frame is 100 A. Step 4 — per-phase check at 230 V: 65.0 A per phase is well within a 100 A board. Result: 100 A main breaker, feeder cable rated ≥100 A after derating (see our breaker-to-wire guide), CT metering optional. Every number here is derived, not guessed — repeat the four steps with your own S, U, and margin.

Applying demand and the 20–25% margin

Nameplate kVA is capacity, not load. Apply a demand factor first (NEC Article 220 style: not everything runs at once), then add 20–25% headroom for motor inrush, harmonic heating, and future circuits. Example: metered peak 60 A on a 100 A transformer = 60% loaded — healthy. The same 60 A on a 63 A unit = 95% — no room for a new circuit or a hot summer day with voltages sagging 5%. For commercial work, size the transformer so normal peak lands at 60–80% of full-load amps. Above 85% sustained, plan the next size up rather than trimming protection to fit.

Breaker and cable selection after the current is known

Convert kVA → amps, then size protection so that IB ≤ In ≤ Iz per IEC 60364-4-43: design current, protective device rating, cable ampacity. A 144 A transformer secondary (100 kVA, 400 V) needs a 160 A frame with cable ampacity ≥160 A after ambient and grouping derating (see derating). Check ampacity charts for the base rating, then multiply by correction factors. Never round the breaker up past the derated cable rating — upsize the cable instead.

Transformer protection per NEC 450 and IEC 60364-4-43

NEC Article 450 sets maximum overcurrent protection as a percentage of rated current (commonly 125% for primary and secondary, with Supervised-location allowances), while IEC 60364-4-43 requires overload protection matched to conductor ampacity. In both systems the logic is identical: protect the conductors and the transformer against sustained overload, and let short-circuit devices handle faults. Primary fuses may be sized above secondary full-load amps because primary current is lower by the turns ratio — compute each side at its own voltage. Always verify the chosen settings against the manufacturer's time-current curves.

Assumptions / when this doesn't apply

This guide assumes: (1) sinusoidal 50/60 Hz steady state — heavy harmonics (data centers, large VFD banks) need K-factor transformers, and plain kVA math understates heating; (2) rated voltage — at −10% voltage the same kVA draws +11% current; (3) balanced three-phase loading — a badly unbalanced panel heats the neutral and the transformer unevenly; (4) standard dry/oil distribution transformers — autotransformers, Scott-T, and phase-shift units follow different rules; (5) ambient within nameplate limits — hot climates derate capacity. When an assumption fails, say so on the design sheet and apply the stricter rule: use measured voltage instead of nominal, meter unbalanced phases separately, or request the manufacturer's derating curves. Documenting the deviation keeps the inspector, the client, and the next engineer on the same page.

Mini case: 75 kVA workshop transformer at 400 V

A metal workshop orders a 75 kVA padmount for a 400 V service. Full-load current: 75000 / 692.8 = 108.3 A. Metered peak with all machines: 82 A (76% loaded — good). With 25% margin: 82 × 1.25 = 102.5 A → 125 A main breaker with feeders rated ≥125 A derated. Inrush on energizing measured 9× for 0.1 s — handled by the time-delay curve, not by oversizing the frame to 160 A. Commissioning test: secondary 398 V under load, phase spread 107–110 A — accepted. Total design time: one page of math instead of a week of emails with the utility.

Common mistakes

First, using 230 V in the three-phase formula — that inflates current by 73%. Second, forgetting √3 entirely. Third, sizing cable to the load instead of the breaker (In ≤ Iz must hold). Fourth, ignoring inrush: a transformer can draw 8–12× rated current on energizing, so an instantaneous-only trip will nuisance-trip. Fifth, copying a 480 V (US) table onto a 400 V (EU) project — currents differ by 20%. When in doubt, recompute from S and your actual line voltage using the kW-to-amps method.

Primary versus secondary: compute each side

A step-down unit carries the same kVA on both sides but very different amps. Take a 150 kVA 11 kV/400 V transformer. Secondary: 150000 / (1.732 x 400) = 216.5 A. Primary: 150000 / (1.732 x 11000) = 7.9 A. Protection differs per side: the 216 A secondary needs a 250 A frame with heavy feeders, while the 7.9 A primary takes small fuses sized per NEC 450 with inrush withstand. Always compute each side at its own voltage and never copy secondary amps onto the primary schedule. For multi-winding units repeat the division per winding at its rated voltage, then verify metering CT ratios against the secondary current you just computed.

Checklist before ordering the transformer

Confirm seven items: actual site voltage (400 versus 415 changes frames at the boundary), metered or calculated peak kVA with demand applied, 20 to 25 percent margin added after demand, breaker frame at or above planning current with cable ampacity above the breaker, inrush cleared by the time-delay curve, metering CTs rated for the secondary current, and spare ways for two future circuits. If any answer is missing, the kVA number is a guess. Record the final S, U, I, breaker, and cable on one page; that sheet becomes the as-built reference for maintenance and the next expansion. Bookmark the tables below; they cover every standard rating met on commercial and light-industrial jobs worldwide. Save the page for site work.

Try it now: sketch your panel or installation in the free GorkyCAD demo — it computes currents, suggests breaker sizes, and builds a single-line diagram in minutes.

Size it in the browser: open the free GorkyCAD demo at https://gorkycad.com/cad/?demo=1 — enter kVA and voltage, get amps, breaker, and a single-line diagram.

Frequently asked questions

What is the formula for transformer amps from kVA?

Single-phase: I = S ÷ U. Three-phase: I = S ÷ (√3 × line voltage). Use VA and volts; the result is full-load amps at rated voltage.

How many amps is 100 kVA at 400 V three-phase?

144.3 A (100000 ÷ 692.8). With a 25% margin that is 180 A of planning current, so a 200 A frame with cable rated accordingly.

Should I size the breaker to the transformer or the load?

To both: the breaker must carry the expected load with margin and stay within conductor ampacity (IB ≤ In ≤ Iz), while respecting NEC 450 maximums for transformer protection.

Why add 20–25% margin?

For motor inrush, future circuits, voltage sag (same kVA draws more amps at lower volts), and harmonic heating. Normal peak at 60–80% of transformer rating is the healthy band.

Does power factor change the kVA-to-amps math?

No — apparent current depends only on kVA and voltage. Power factor splits that current into active and reactive parts but does not change the ampere total the conductors carry.