Small commercial sites — cafés, workshops, clinics, retail — usually get three-phase service long before anyone does a three-phase calculation. The result is familiar: one phase runs hot, the neutral carries the imbalance, breakers nuisance-trip, and the utility bill carries demand charges nobody planned for.

This guide shows the working method: convert kW to amps per phase, spread loads deliberately, verify balance with a table, and finish with a panel schedule that an inspector and the next electrician can both read. Math follows standard three-phase relations with NEC Article 220 and IEC 60364-5-52 references.

1. Why balance matters more than total kW

A 30 kW total means little until you know the per-phase currents. Perfectly balanced at 400 V and cos φ 0.9, 30 kW draws about 48 A per phase. Put 18 kW on L1 and 6 kW each on L2/L3 and L1 carries roughly 87 A while the others carry 29 A — same total, but L1 needs a bigger breaker and wire, the neutral carries the residual, and any single-phase protection set for the average is wrong.

Utilities notice too: many commercial tariffs penalize peak demand and poor power factor, and chronic imbalance shortens motor and driver life. Balance is not elegance; it is capacity you already paid for.

2. The two formulas you need

Three-phase current from power: I = P / (√3 × U_line × cos φ × η), where U_line is 400 V (or 208 V in North America), cos φ is power factor, and η is efficiency for motors. Single-phase current from the same load: I = P / (U_phase × cos φ), with U_phase 230 V (or 120 V). The √3 (≈1.732) is the whole difference between the two — forgetting it is the most common spreadsheet error in small shops.

Power factor defaults when the nameplate is silent: resistive heating 1.0, LED lighting with drivers 0.9, small motors 0.75–0.85, mixed commercial 0.85–0.9. Efficiency for small motors 0.8–0.9. State your assumptions on the calculation sheet — the next engineer must see them.

3. kW to amps: quick table (400 V, cos φ 0.9)

Load (balanced 3-phase)Current per phaseBreaker hintCopper wire hint (75 °C)
10 kW16.0 A20 A 3-pole2.5–4 sq mm / 12–10 AWG
15 kW24.1 A32 A 3-pole6 sq mm / 10 AWG
20 kW32.1 A40 A 3-pole10 sq mm / 8 AWG
30 kW48.1 A63 A 3-pole16 sq mm / 6 AWG
40 kW64.1 A80 A 3-pole25 sq mm / 4 AWG
50 kW80.2 A100 A 3-pole35 sq mm / 2 AWG

4. Spread the single-phase loads deliberately

Three-phase equipment balances itself; single-phase loads do not. List every single-phase load with its phase assignment before pulling wire: L1 gets the front lighting plus one AC, L2 the rear lighting plus the second AC, L3 the kitchenette plus signage — then check the sums. Rotate identical units across phases (three 3.5 kW AC units go one per phase, not all on L1 because "the conduit was closer").

Keep each phase's single-phase subtotal within 10–15 percent of the average. If L1 totals 12 kW, L2 11 kW, L3 8 kW, move a 2–3 kW load (water heater timer, display lighting) from L1 to L3 and recheck. The neutral current falls, breaker margins equalize, and future additions fit anywhere.

5. Worked example: 30 kW small retail site

Loads: HVAC 3 × 3.5 kW single-phase (one per phase), lighting 4 kW spread evenly, ovens 8 kW three-phase, refrigeration 4 kW three-phase, POS and office 2 kW on L2, signage and shutters 1.5 kW on L3, water heater 2 kW on L1. Connected total: 10.5 + 4 + 8 + 4 + 2 + 1.5 + 2 = 32 kW.

Apply diversity 0.85 to HVAC and lighting, 1.0 to the rest: demand ≈ 29.6 kW, round to 30 kW. Balanced current: I = 30,000 / (1.732 × 400 × 0.9) ≈ 48 A per phase. Feeder: 63-A three-phase main, 5 × 16 sq mm copper (check voltage drop for the actual run length per IEC 60364-5-52 / NEC 210.19(A) informational note 3–5 percent limits).

PhaseAssigned loadsSubtotal (demand)Share
L1AC-1 3.2 + lighting 1.1 + water heater 2.0 + share of 3-ph 4.010.3 kW35%
L2AC-2 3.2 + lighting 1.1 + POS/office 2.0 + share of 3-ph 4.010.3 kW35%
L3AC-3 3.2 + lighting 1.1 + signage 1.5 + share of 3-ph 4.09.8 kW33%
Total—30.4 kW demandmax deviation 4%

6. Reading the table: what good balance looks like

Phase subtotals within 10 percent of each other are good; within 5 percent is excellent and worth keeping. Neutral current in a balanced linear system approaches zero; with LED drivers and switch-mode supplies, expect 20–40 percent of phase current as triplen-harmonic neutral even at "perfect" balance — size the neutral accordingly (full-size at minimum, oversized where harmonics dominate) rather than assuming it idles.

Document the assignment on the panel directory: "L1 — AC-1, front lights, water heater" beats "lights 1–4" when someone adds a circuit in two years. The schedule above is the deliverable, not the total kW.

7. Mini-case: the café with two dead phases

A 70 sq m café ran everything single-phase off L1 and L2 of a three-phase service "because the old shop was single-phase and it worked." L1 carried 61 A on a 63-A main, L2 carried 44 A, L3 carried 3 A of corridor lighting. The L1 breaker tripped every Saturday when the ovens, espresso machine, and AC coincided — and the owner bought a bigger L1 breaker, which only moved the failure to the feeder fuse.

The fix was a Saturday-morning re-termination: espresso and one AC to L3, water heater timer to L3 nights, pastry oven stays on L1. Phase currents after: 38 / 36 / 34 A. No new service, no new panel — just assignment. The demand charge fell 12 percent the next quarter because the 15-minute peak stopped spiking on one phase.

Verify wire size against length, not just current. A 48-A load allows 16 sq mm copper by ampacity, but a 60-m run at that current drops over 3 percent — beyond the combined feeder-plus-branch guidance — so the correct answer for long runs is often one size larger than the ampacity table says. Run the voltage-drop formula from IEC 60364-5-52 Annex G or NEC Chapter 9 Table 8 for every feeder over 25 m before ordering cable.

8. Five unbalancing mistakes

First, landing all single-phase units on the nearest phase to save conduit — the labor saving is trivial against a service upgrade later. Second, forgetting the √3 and sizing three-phase wire from single-phase math (or the reverse). Third, half-loading: adding every future load "to L1 for now." Fourth, ignoring harmonics — balanced fundamentals with unbalanced triplens still overheat a skinny neutral. Fifth, no phase labels in the panel — the next addition unbalances blindly because nobody knows what is where.

9. Assumptions and when this does not apply

This guide assumes a small commercial service up to about 100 A per phase on 208Y/120 V or 400Y/230 V, with standard breaker panels and no on-site generation. It does not cover services with large motors (starting currents and power-factor correction need a motor study), medical or hazardous locations, or sites with solar and export limits — bidirectional flows change protection and metering assumptions.

Confirm the service type with the utility (high-leg delta still exists in older North American buildings and breaks naive phase math), and verify fault current and metering CT ratios before ordering the main.

10. Commissioning checklist

Clamp-meter all three phases at lunchtime peak and after closing; record the readings on the schedule with the date. Verify neutral current against expectations, torque-check terminations after the first thermal cycle, and confirm breaker and wire sizes against the per-phase maxima — not the average. Then photograph the directory and file it with the single-line diagram: balance is a living document, good until the next appliance arrives.

Mind the neutral and the meter. In offices and retail with heavy LED and IT loads, triplen harmonics (3rd, 9th, 15th) add in the neutral instead of canceling, so a neutral sized at half the phase conductors — legal in some old practice — runs hot even when phases look balanced. Specify full-size neutrals as the minimum and consider double-size neutrals where nonlinear load exceeds half the total. On the metering side, most small-commercial tariffs bill the highest 15-minute demand peak of the month: one Saturday of coincident peaks can set the demand charge for thirty days. Stagger heavy starts (water heater timer, preheat schedule) so the meter never sees everything at once.

See also:

See also: kW to Amps Calculator (3-Phase), Panel Load Balancing (3-Phase), Panel Schedule Generator Template.

Assign phases before you pull wire: open the free demo at https://gorkycad.com/cad/?demo=1, lay out the panel with per-phase totals, and export the load table with the single-line diagram.

Balance phases and build the panel schedule — try the free demo at https://gorkycad.com/cad/?demo=1

Frequently asked questions

How do I convert 30 kW to amps three-phase?

I = P / (√3 × U × cos φ). At 400 V and cos φ 0.9, 30 kW draws about 48 A per phase balanced. At 208 V the same load draws about 93 A — voltage changes everything.

What is acceptable phase imbalance?

Keep single-phase subtotals within 10 percent of the average; 5 percent is excellent. Beyond 15 percent, move a 2–3 kW load to the light phase and recheck.

Why is my neutral hot on balanced phases?

Triplen harmonics from LED drivers and switch-mode supplies add in the neutral instead of canceling — expect 20–40 percent of phase current there and size the neutral full-size or larger.

Can I put all AC units on one phase?

No. Rotate identical single-phase units across L1/L2/L3. Three 3.5 kW splits on one phase add 45 A to it alone — the most common small-shop unbalance.

What panel does a 30 kW shop need?

Near 48 A per phase balanced: a 63-A three-phase main with 5 × 16 sq mm copper feeder (verify voltage drop for your run), plus 20–30 percent spare ways.

Related reading