A restaurant kitchen fails electrically in predictable ways: the fryer trips the oven, the hood controller drops out mid-service, or the panel that looked fine on paper runs at 95 percent load on a Friday night. The fix is planning loads, circuits, and the panel together — not adding breakers after the equipment arrives.

This guide walks through power planning for a small restaurant kitchen: typical equipment loads, dedicated circuits, GFCI and ground-fault rules, and a worked 60 sq m example with a panel schedule. References are to the NEC (Articles 210, 220, 422) with IEC 60364-5-52 notes where practice differs outside North America.

1. List every appliance first, with nameplate data

Start from nameplates, not from guesses. For each appliance record voltage, phases, full-load current or kW, and whether it is continuous (runs 3 hours or more — fryers, ovens, hot holding). A deep fryer rated 12 kW three-phase at 208 V draws about 33 A per phase; the same kW at 400 V three-phase draws about 17 A. That difference decides wire size, breaker size, and whether you need a bigger service.

Do not forget the quiet loads: hood exhaust and makeup-air fans, walk-in cooler and freezer compressors, dish machine booster heater, point-of-sale stations, and the small army of countertop units (panini press, soup wells, heat lamps). They are small individually and decisive together.

2. Typical equipment loads

The table below gives planning ranges. Always replace them with the actual nameplate before buying wire — models vary by 30 percent or more.

EquipmentTypical ratingCurrent at 208 V 3-phaseCircuit hint
Deep fryer, double11–14 kW31–39 ADedicated 3-phase, 40–50 A
Convection / deck oven8–12 kW22–33 ADedicated 3-phase, 30–40 A
Range with oven12–18 kW33–50 ADedicated 3-phase, 50–60 A
Hood exhaust + makeup air1.5–3 kW motors4–8 ADedicated motor circuit each
Walk-in cooler / freezer1–2.5 kW each3–7 AIndividual 20-A circuits
Dish machine + booster6–10 kW total17–28 ADedicated 3-phase, 30 A
Countertop small appliances1–2 kW each, 120 V8–17 A20-A small-appliance branches, max 2 per circuit
POS, lighting, office1–3 kW—Separate clean circuits

3. Dedicated lines: what gets its own circuit

Anything with a heating element or a compressor gets a dedicated circuit: fryer, oven, range, dish machine, booster heater, walk-in cooler, walk-in freezer, ice machine. Hood fans and makeup-air units each get their own motor circuits with proper overload protection. Countertop cooking equipment on 120 V should be limited to one or two units per 20-A circuit — a 1500-W soup well plus a 1200-W warmer already draws 22.5 A together and will trip a 20-A breaker mid-service.

Keep kitchen receptacle circuits off the dining-room lighting and POS circuits. When the fryer breaker trips at 7 pm, the dining room lights and the card readers must stay on.

4. GFCI and ground-fault requirements

NEC 210.8(B) requires GFCI protection for personnel on 125-V through 250-V receptacles in commercial kitchens — effectively every countertop and prep-area outlet. Dishwasher and drinking-fountain-adjacent outlets have their own GFCI triggers. Equipment with high leakage (long heater elements, old motors) trips cheap GFCI receptacles nuisance-style; use commercial-grade GFCI breakers or feed-through devices and keep one high-leakage appliance per GFCI zone so a trip does not darken half the line.

Under IEC 60364-4-41, the equivalent is 30 mA RCD protection on socket-outlets up to 32 A in comparable locations. Whichever code applies, the design goal is identical: a ground fault in one appliance must not kill the whole kitchen.

5. Demand and load calculation

Kitchen equipment rarely runs all at once at full power, so NEC Article 220 permits demand factors — but be conservative with restaurants, where Friday dinner really does run everything. A common working method: take 100 percent of the two largest cooking loads, 65–80 percent of the rest of the cooking load, 100 percent of refrigeration and hood motors, and 125 percent of any continuous load (NEC 210.19(A) / 215.2(A) continuous-load rule).

Convert properly: three-phase current I = P / (√3 × U × cos φ). For resistive heating cos φ ≈ 1.0; for motors use 0.8–0.85. Then size the feeder at 125 percent of the continuous portion plus 100 percent of the rest, and check the service headroom against the utility supply.

6. Worked example: 60 sq m kitchen at 208 V three-phase

Equipment list: fryer 12 kW, convection oven 10 kW, range 15 kW, dish machine 8 kW, two walk-ins 2 kW each, hood set 2.5 kW, countertop package 6 kW (120 V), POS and lighting 2 kW. Connected total: 59.5 kW.

Apply demand: two largest cooking (15 + 12 = 27 kW at 100 percent), remaining cooking (10 + 8 = 18 kW at 70 percent = 12.6 kW), refrigeration and hood (4 + 2.5 = 6.5 kW at 100 percent), countertop and misc (8 kW at 65 percent = 5.2 kW). Demand total ≈ 51.3 kW. Feeder current: I = 51,300 / (1.732 × 208 × 0.95) ≈ 150 A. A 200-A panel with 225-A bus and a 175–200 A main gives working headroom; a 150-A service would run at the edge with no room for a future combi oven.

Circuit groupDemand kWBreakerWire (copper, 75 °C)
Fryer 12 kW12.050 A 3-pole3× 6 AWG + ground
Range 15 kW15.060 A 3-pole3× 4 AWG + ground
Oven 10 kW + dishwasher 8 kW (diversified)12.62× 40 A 3-pole3× 8 AWG each
Walk-ins 2× 2 kW4.02× 20 A 1-pole12 AWG each
Hood set 2.5 kW2.52× 20 A (motor rated)12 AWG each
Countertop 6 kW (120 V)3.93× 20 A 1-pole GFCI12 AWG each

7. Mini-case: the Friday-night trip

A 45-seat bistro ran its 12 kW fryer and 10 kW oven on one 60-A feeder circuit "because the panel was full." It held for lunch service for months. On the first fully booked Friday, both thermostats called for heat together with the 6 kW booster — 28 kW on a circuit sized for 20 kW diversified. The feeder breaker tripped at 7:40 pm, the hood contactor dropped with it, and the kitchen lost ventilation until the breaker cooled enough to reset.

The repair was a half-day panel rework: separate 50-A and 40-A breakers, independent neutrals, hood controls moved to their own circuit. Cost of the rework was roughly five times the cost of two extra breaker positions at build time. Panel space is the cheapest insurance in a kitchen — leave 20–30 percent spare ways on day one.

8. Five mistakes that shut kitchens down

First, sharing one circuit between fryer and oven because "diversity covers it" — thermostat coincidence defeats diversity at peak. Second, no spare breaker ways — the first added appliance needs a sub-panel. Third, one GFCI zone for the whole prep line — one leaky warmer darkens six outlets. Fourth, 120-V countertop loads guessed instead of metered — two "small" 1500-W units already exceed a 20-A circuit. Fifth, hood interlock wired through the cooking breaker — a tripped breaker must never kill ventilation; interlock the gas or shunt-trip separately.

9. Assumptions and when this does not apply

This guide assumes a small restaurant or café kitchen up to roughly 100 sq m on a 208Y/120 V or 400Y/230 V three-phase service under NEC or IEC 60364 practice. It does not cover food factories, central commissaries with 200-A-plus cooking lines, or hazardous locations with grease-duct fire suppression interlocks beyond the basic shunt-trip concept. Gas-fired equipment changes the electrical picture (ignition, controls, and interlocks instead of heater loads) — size those from the gas appliance manuals.

Utility rules vary: some districts require separate metering for kitchen exhaust or limit single-phase loading on commercial services. Confirm service capacity, fault current, and metering rules with the utility before ordering the panel.

10. Panel and checklist before opening night

Specify a panel with a rated bus above the feeder breaker (for example 225-A bus with a 200-A main), copper bus, space for 20–30 percent future breakers, and a directory that names appliances instead of "kitchen plugs 1–6." Verify: every heater and compressor on its own breaker; GFCI zones limited to one or two outlets each; hood and makeup air independent of cooking breakers; neutral and ground separated past the service; and the demand calculation taped inside the door with the date.

Size the service, not just the branches. A 150-A demand on a 200-A service leaves room for one more appliance; the same demand on a 150-A service leaves none, and the next health-code upgrade (a second fryer, a faster dishwasher) triggers a service change with utility shutdowns. Check voltage drop on long runs too: a 30-m feeder at 150 A needs substantially larger copper than the 75 °C ampacity table alone suggests, per the NEC 210.19(A) informational notes that recommend keeping branch and feeder drop near 3 and 5 percent combined. When in doubt, upsize the feeder one step — copper is cheap compared to a second shutdown.

See also:

See also: Electrical Load Calculation for a House, kW to Amps Calculator (3-Phase), Breaker Size Calculator: Load to Wire.

Put your equipment list on a real panel: open the free demo at https://gorkycad.com/cad/?demo=1, build the schedule above, and export the single-line diagram with the load table.

Plan a restaurant kitchen panel with real loads — try the free demo at https://gorkycad.com/cad/?demo=1

Frequently asked questions

Does each fryer need its own circuit?

Yes. Heating appliances and compressors each get dedicated circuits sized from the nameplate. Sharing a fryer with an oven relies on diversity that disappears exactly at peak service.

What size panel does a 60 sq m kitchen need?

The worked example lands near 150 A of demand, so a 200-A panel with a 225-A bus is the practical choice — a 150-A service would run with no headroom for future equipment.

Do kitchen outlets need GFCI?

NEC 210.8(B) requires GFCI protection for 125–250 V receptacles in commercial kitchens. Keep high-leakage appliances on separate GFCI zones so one trip does not shut the whole line.

Can I put the hood fan on the cooking circuit?

No. Hood exhaust and makeup air need independent motor circuits. A tripped cooking breaker must never kill ventilation.

How much spare panel space should I leave?

Leave 20–30 percent spare breaker ways at build time. Adding a sub-panel later costs several times more than empty spaces now.