kVA and kW both measure power, but they are not the same thing — and mixing them up is how generators, UPS units, and transformers end up undersized. kW is real power that does work: heat, light, torque. kVA is apparent power: what the source must deliver, including the reactive part that sloshes back and forth in motors and transformers. The link between them is power factor.

This article explains the difference in plain language, gives the conversion formulas both ways, a ready table from 10 to 500 kVA, and shows where the distinction actually costs money: generator sizing, UPS selection, and transformer loading.

1. Real, Reactive and Apparent Power in One Paragraph

Think of a glass of beer: the beer is real power (kW), the foam is reactive power (kVAr), and the whole glass is apparent power (kVA). Resistive loads — heaters, incandescent lamps — drink the whole glass: kW equals kVA. Motors, transformers, and anything with coils or capacitors leave foam: the source must pour a bigger glass (kVA) to deliver the same beer (kW).

Power factor (cos φ) is the ratio: PF = kW / kVA. A motor with PF 0.8 needs 1.25 kVA of supply for every 1 kW of shaft work. Utilities bill homes for kW but bill industry for kVA or penalize low power factor — which is why this topic decides real money.

2. The Formulas (Three-Phase and Single-Phase)

Three-phase apparent power: S (kVA) = √3 × U × I / 1000, with line voltage U in volts and current I in amps. Real power: P (kW) = √3 × U × I × cos φ / 1000. So P = S × cos φ and S = P / cos φ. Single-phase: S (kVA) = U × I / 1000, P (kW) = U × I × cos φ / 1000.

Worked example: a 400 V three-phase motor draws 90 A at cos φ 0.85. Apparent power: 1.732 × 400 × 90 / 1000 = 62.4 kVA. Real power: 62.4 × 0.85 = 53.0 kW. A 55 kVA generator would be overloaded; a 70 kVA unit fits with margin.

3. Conversion Table: 10–500 kVA to kW

Apparent powerkW at cos φ 0.8kW at cos φ 0.9kW at cos φ 1.0
10 kVA8.09.010.0
25 kVA20.022.525.0
50 kVA40.045.050.0
100 kVA80.090.0100.0
200 kVA160.0180.0200.0
315 kVA252.0283.5315.0
500 kVA400.0450.0500.0

Read the table from the load side: a 100 kW resistive heater bank needs only 100 kVA, but the same 100 kW of motor load at PF 0.8 needs 125 kVA of supply. Always convert in this direction — from the load's kW and power factor to the source's kVA — when sizing equipment.

4. Why Generators Are Rated in kVA

A generator's alternator is limited by current (heating of windings), not by your power factor — so its nameplate is in kVA. The engine behind it is limited in kW. A typical "100 kVA / 80 kW" set assumes PF 0.8. Feed it a purely resistive 90 kW load and the engine overloads while the alternator still has headroom; feed it 100 kVA at PF 0.6 (60 kW) and the alternator is at its limit with the engine half-loaded.

Rule: the generator must satisfy both numbers — kVA for current, kW for engine power. For motor-heavy sites also check starting kVA, which is 5–7 times running current for direct-on-line starting and dominates the sizing.

5. UPS Sizing: The 0.9 Trap

UPS units are rated in both kVA and kW, often at different ratios — e.g. 10 kVA / 9 kW (PF 0.9). A server rack drawing 8.5 kW at PF 0.95 needs 8.9 kVA: it fits the kW rating but check both. Older UPS designs were rated at PF 0.8 (10 kVA / 8 kW), so a like-for-like kVA swap can silently lose 1 kW of real capacity.

Worked check: load 6 kW at PF 0.7 (old magnetic ballasts, cheap PSUs) on a 10 kVA / 9 kW UPS. Apparent: 6 / 0.7 = 8.57 kVA — fits. Real: 6 kW — fits. But add 2 kW more at the same PF: 8 / 0.7 = 11.4 kVA — overload on kVA while kW (8) still looks fine. Low power factor eats UPS capacity first.

6. Transformers: kVA, Loading and Losses

Transformers are rated in kVA because they serve mixed loads with unknown power factor. A 400 kVA transformer at 0.85 average PF delivers 340 kW. Best-efficiency loading is typically 40–60 %; running at 15 % wastes no-load (iron) losses, running above 90 % leaves no room for motor starts and shortens life.

Example: a workshop with 250 kW of mixed load at PF 0.78 needs 250 / 0.78 = 320 kVA minimum — a 315 kVA unit is already marginal, so the correct choice is 400 kVA (loaded at 80 %). After power factor correction to 0.95, the same load needs only 263 kVA and the 315 kVA unit fits with margin to spare.

7. Measuring Power Factor in Practice

Clamp meter plus calculation is the honest field method: measure line current I and voltage U, read real power P from the meter or energy analyzer, then cos φ = P / (√3 × U × I). A power quality analyzer gives PF, displacement PF, and harmonics directly — important because cheap meters confuse displacement PF with true PF on LED and VFD loads.

Take readings at typical load, not at idle: an unloaded motor shows PF 0.2–0.3, which says nothing about its full-load 0.85. Log over a working day where billing or correction sizing depends on it.

8. Mini-Case: 150 kW Workshop, Three Quotes, One Mistake

A workshop with 150 kW of machine load at PF 0.75 needs 200 kVA. Quote A offers a 160 kVA generator ("150 kW, close enough") — undersized by 25 %, it will trip on the first simultaneous start. Quote B offers 200 kVA / 160 kW — correct on current, and the engine covers 150 kW with 10 kW margin. Quote C offers 250 kVA — comfortable but 25 % more fuel per hour at light load. The buyer who understands kVA vs kW picks B and spends the difference on a soft starter.

9. Assumptions / When This Doesn't Apply

These conversions assume sinusoidal 50/60 Hz systems where cos φ is meaningful. They need adjustment when: (1) harmonics dominate (VFDs, welders, large LED arrays) — use true PF including distortion, not displacement cos φ; (2) loads are single-phase and unbalanced — size per phase, not from the three-phase total; (3) motor starting current governs — size from starting kVA, not running kW; (4) the source limits kW first (engine, fuel cell) rather than kVA; (5) short duty cycles apply — intermittent loads may use thermal ratings instead of continuous kVA.

10. Checklist: Sizing Any Source in Five Minutes

List every load in kW with its power factor; convert each to kVA (P / cos φ); add diversity (not everything runs at once); take the larger of total kVA and total kW against the nameplate; add 20–25 % margin and check the single largest motor start. Write the two numbers — required kVA and required kW — on the inquiry, and no supplier can sell you the wrong machine.

11. Power Factor Correction Changes the Math

Capacitor banks supply reactive power locally, so the source sees less kVA for the same kW. Correcting the 150 kW / 0.75 workshop to 0.95 drops the supply need from 200 to 158 kVA — one transformer size smaller, lower losses, no utility penalty. Sizing capacitors is its own topic with resonance risks; the companion article below works the full calculation.

12. From Numbers to a Project File

Once the kVA and kW are known, they belong in a proper design file: load schedule with cos φ per circuit, breaker and cable sized from the corrected current, transformer or generator schedule matched on both numbers. GorkyCAD builds exactly that chain — enter loads once, and the single-line diagram, cable schedule, and bill of quantities stay consistent when power factor changes.

Appendix: Full-Load Current at 400 V for Common Sizes

A second table many buyers need on the same page is current itself, because breakers and cables are bought in amps. At 400 V three-phase, I = S × 1000 / (√3 × 400) = S × 1.443. A 100 kVA source gives 144.3 A regardless of power factor — the power factor only decides how much of that current does useful work. Keep this table next to the main one when you write the inquiry: the supplier checks kVA against the alternator, kW against the engine, and amps against the breaker.

Source sizeLine current at 400 VUsable kW at PF 0.8Typical breaker
25 kVA36.1 A20.040 A
50 kVA72.2 A40.080 A
100 kVA144.3 A80.0160 A
200 kVA288.7 A160.0315 A
500 kVA721.7 A400.0800 A

Common mistakes to avoid: quoting only kW to a generator vendor (they will assume PF 1.0 and undersize the alternator); reading UPS autonomy charts at the wrong power factor; and forgetting that a site with many small single-phase loads needs the per-phase check too — 150 kW evenly spread is 50 kW per phase, but a 90/30/30 split overloads one alternator winding while the total looks fine. Measure phase currents under real load before signing the purchase order, and re-check after every major load change.

Size your own loads: https://gorkycad.com/cad/?demo=1&lang=en — free demo, no signup, with load and power-factor checks built in.

Size it before you buy it: open the free demo at https://gorkycad.com/cad/?demo=1&lang=en — enter loads and power factor, and get breaker, cable and transformer sizing with checks.

Frequently asked questions

Is 1 kVA equal to 1 kW?

Only at power factor 1.0 (purely resistive load). At PF 0.8, 1 kVA delivers 0.8 kW. Always multiply kVA by the actual power factor to get usable kW.

Why are generators rated in kVA instead of kW?

The alternator is limited by current (heating), which is kVA, while the engine is limited in kW. Both ratings matter: the set must cover your load's kVA and its kW at the same time.

What power factor should I assume if I don't know it?

For mixed motor loads use 0.75–0.8; offices with electronics 0.85–0.9; heaters and incandescent lighting 1.0. Measure the real site before buying equipment.

Can a UPS be overloaded on kVA but fine on kW?

Yes — that is the classic UPS trap. Low power factor loads (0.7) hit the kVA limit first. Check both ratings, especially when replacing an older 0.8-PF UPS with a 0.9-PF model.

Does power factor correction reduce my electricity bill?

It reduces kVA demand charges and penalties, transformer losses, and may let you use a smaller supply. It does not reduce the kWh your loads consume.