A detached garage needs its own feeder: an underground circuit from the house panel to a small subpanel in the garage. Get three things right — burial depth, wire size with voltage drop, and neutral-ground separation — and the job passes inspection the first time. This guide covers NEC Article 300.5 burial depths, UF-B cable versus conduit, GFCI and disconnect rules, and a full worked example: a 60 A feeder over 30 m (100 ft).
All numbers below are either calculated (formula shown) or quoted from NEC 300.5, 310.16, 250.32, 210.8, 225.31–225.33, or IEC 60364-5-52 for metric equivalents. US examples use 120/240 V single-phase; metric conversions are given for readers outside North America.
1. What a garage feeder actually is
A feeder is the set of conductors between the service equipment (your house panel) and the subpanel in the garage. It is not a branch circuit: it carries the whole garage load, it has its own overcurrent protection at the source, and the garage gets a panelboard with its own breakers. Typical garage feeders are 40–60 A for a workshop (lights, receptacles, compressor, EV charger rough-in) and 20–30 A for a basic storage garage (lights plus one receptacle circuit).
Decide the load first. List everything: general lighting, receptacles, door opener (about 600 W running, higher at start), dust collector or compressor (check the nameplate), heater, and any future EV charger. Add them in volt-amperes, apply demand sensibly, and size the feeder for the total plus margin. The worked example in section 4 uses a realistic 60 A design load.
2. Burial depths: NEC Table 300.5
NEC Table 300.5 gives minimum cover — measured from the top of the cable or raceway to finished grade — by wiring method and location. The three rows that matter for a house-to-garage run are direct-buried cable, rigid/nonmetallic raceway, and the residential 120 V, 20 A-or-less GFCI-protected branch-circuit exception.
| Wiring method | Under lawn / garden (mm / in) | Under driveway / parking (mm / in) |
|---|---|---|
| Direct burial (UF-B, USE) | 600 mm / 24 in | 600 mm / 24 in |
| Rigid metal conduit (RMC, IMC) | 150 mm / 6 in | 150 mm / 6 in |
| PVC conduit (Schedule 40/80) | 450 mm / 18 in | 600 mm / 24 in |
| Residential 120 V ≤20 A GFCI-protected at source | 300 mm / 12 in | 300 mm / 12 in* |
* The 300 mm column applies to the GFCI-protected residential exception; driveways subject to vehicle traffic still need the full driveway depth for most methods, so route the feeder under lawn wherever possible. Always confirm the local amendment — some jurisdictions require 600 mm across the board.
Practical note: depth is cover, not trench depth. A 100 mm conduit buried with 450 mm of cover needs a 550 mm deep trench. Add a warning ribbon 150–300 mm above the cable or conduit; inspectors like it and diggers need it.
3. UF-B direct burial versus conduit
UF-B (underground feeder, NEC Article 340) can go straight in the ground at 600 mm cover. PVC conduit with THHN/THWN-2 conductors needs 450 mm under lawn but lets you pull new wire later without digging. Rigid metal conduit needs only 150 mm but costs far more and still corrodes at the joints if badly installed.
| Property | UF-B direct burial (NEC 340) | THWN-2 in PVC conduit | THWN-2 in rigid metal conduit |
|---|---|---|---|
| Cover under lawn | 600 mm / 24 in | 450 mm / 18 in | 150 mm / 6 in |
| Temperature rating | 90 °C dry (60 °C wet ampacity basis) | 90 °C dry / 75 °C wet | 90 °C dry / 75 °C wet |
| Future upgrade | Dig again | Pull new conductors | Pull new conductors |
| Physical protection | Sleeve where it emerges from grade | Schedule 80 where exposed | Inherently strong |
| Typical cost | Lowest first cost | Medium | Highest |
For a 30 m garage run most electricians choose PVC conduit: one afternoon of extra trenching depth buys a lifetime of re-pullable upgrades (add the EV charger later without a shovel). Where UF-B emerges from grade, NEC 300.5(D) requires protection — a conduit sleeve from below grade to above it.
4. Worked example: 60 A feeder over 30 m
Given: design load 60 A at 240 V, one-way distance 30 m (about 100 ft), copper THWN-2 in PVC conduit, 75 °C terminations. Step 1 — base ampacity. Per NEC Table 310.16, 6 AWG copper is 65 A at 75 °C and 4 AWG is 85 A at 75 °C. The 125 % continuous-load rule (NEC 215.2) applies to the feeder rating: if the 60 A is continuous, the feeder must be rated 60 × 1.25 = 75 A, which forces 4 AWG copper (85 A) rather than 6 AWG (65 A).
Step 2 — pick the breaker. Standard size per NEC 240.6: 60 A breaker protects 4 AWG copper (85 A ampacity) with margin. Step 3 — grounding conductor. Per NEC Table 250.122, a 60 A overcurrent device needs a 10 AWG copper equipment grounding conductor. So the feeder is 2 × 4 AWG ungrounded + 1 × 4 AWG neutral (or 6 AWG neutral if engineered, but keep it full-size for simplicity) + 10 AWG ground, all THWN-2, in 1-inch (27 mm) PVC conduit — verify conduit fill per NEC Chapter 9 tables.
5. Voltage drop check on the same run
Single-phase drop: VD = 2 × K × I × L / CM, with K = 12.9 ohm·cmil/ft for copper, I in amps, L one-way length in feet, CM circular mils of the conductor. For 4 AWG (41,740 cmil), 60 A, 100 ft: VD = 2 × 12.9 × 60 × 100 / 41,740 = 154,800 / 41,740 = 3.71 V. On a 240 V base that is 3.71 / 240 = 1.55 %. NEC informational notes (210.19(A), 215.2(A)) suggest keeping feeder plus branch drop under about 5 %, with the feeder ideally under 2–3 %.
| Option | VD (V) | VD (%) | Verdict |
|---|---|---|---|
| 6 AWG, 60 A, 100 ft | 5.87 | 2.45 | Tight but acceptable; fails the 125 % rule anyway |
| 4 AWG, 60 A, 100 ft | 3.71 | 1.55 | Good — our pick |
| 3 AWG, 60 A, 100 ft | 2.94 | 1.22 | Better for future EV load |
If the run were 60 m instead of 30 m, 4 AWG would give about 3.1 % and you would step up to 3 AWG or 2 AWG. That is the standard trade: copper now versus a second trench later.
6. The garage subpanel: neutral, ground, and bonding
At a detached structure, NEC 250.32 requires a grounding electrode (ground rod or equivalent) at the garage and — critically — the neutral must stay isolated from ground in the subpanel. Remove the neutral bonding jumper, land neutrals on the isolated neutral bar, grounds on the bonded ground bar, and connect the grounding electrode conductor to the ground bar only. Bonding neutral and ground together at the subpanel creates parallel neutral return paths and is one of the most common inspection failures.
Size the panel with spare ways: a 12-space panel for an 8-breaker design load is reasonable. Label the feeder breaker in the house panel ("Garage 60 A") and the subpanel directory. Fit a main breaker in the garage panel as the disconnect if it has more than six breakers (NEC 225.33 allows up to six disconnects per supply; a single main is simpler).
7. GFCI, disconnect, and outdoor details
Garage receptacles need GFCI protection per NEC 210.8(A) — protect the 125 V receptacle circuits in the garage with GFCI breakers or receptacles. The feeder itself does not need GFCI (it is not a 120 V branch circuit), but any 15/20 A 125 V receptacle outlet in the garage does. Outdoor receptacles on the garage wall need weather-resistant GFCI devices with in-use covers.
Provide a disconnecting means at the garage (NEC 225.31): the subpanel main breaker qualifies. Where the feeder emerges from grade, use Schedule 80 PVC or rigid conduit for physical protection, seal the raceway against water (drainage, not hermetic plugs that trap condensation), and keep splices out of the trench — pull continuous conductors from panel to panel.
8. Assumptions and when this does not apply
- Residential 120/240 V single-phase, 60 A design load, copper conductors. Aluminium feeders (common at 100 A+) need upsizing and Al-rated terminations — not covered here.
- Soil without rock, frost below trench depth, no vehicle loading over the lawn run. Rocky ground, permafrost, or under-slab routes need engineered details.
- No hazardous locations, no corrosive soils, no floodplain rules. Those add coatings, deeper burial, or relocation.
- Service is large enough: a 60 A feeder on a 100 A house service needs a load calculation (NEC Article 220) first — the example assumes the service has capacity.
- Local amendments win: some cities require rigid conduit everywhere or deeper cover. Check before digging.
9. Mini-case and the five classic mistakes
Case: a 30 m lawn run to a two-car garage, compressor (2.2 kW), door opener, lighting, six receptacles, future EV rough-in. Design load set at 60 A continuous-equivalent. Result: 1-inch PVC at 450 mm cover, 3 × 4 AWG THWN-2 plus 10 AWG ground, 60 A breaker at the house, 12-space subpanel with isolated neutral, one ground rod at the garage, warning tape at 250 mm. Inspection passed with one comment — the warning tape, which the inspector thanked us for.
Classic mistakes: (1) bonding neutral to ground in the subpanel; (2) 300 mm cover for a 240 V feeder (the 12-inch exception is only for ≤20 A 120 V GFCI branch circuits); (3) NM-B cable outdoors or underground — NM-B (NEC 334) is indoor-only, it rots in conduit underground; (4) no expansion fitting where PVC crosses soil grades; (5) forgetting the garage grounding electrode because "the ground wire comes from the house".
10. See also and try it on your plan
Related guides: our cable size calculator (amps and kW to mm² and AWG), the wire ampacity chart explained, and the breaker sizing guide. For the trench-to-panel route and conduit fill, see the conduit fill calculator.
Draw the house, the trench, and the garage subpanel in the free demo: place the feeder, check the panel schedule, and export the one-line diagram and bill of materials as PDF.
Try it on your own plan — open the free demo at https://gorkycad.com/cad/?demo=1, no registration needed.
Frequently asked questions
How deep must a garage feeder be buried?
Per NEC Table 300.5: direct-burial cable 600 mm (24 in), PVC conduit 450 mm (18 in) under lawn and 600 mm under driveways, rigid metal conduit 150 mm (6 in). The 300 mm (12 in) depth applies only to 120 V, 20 A-or-less GFCI-protected residential branch circuits.
Can I run NM-B cable underground to a garage?
No. NM-B (NEC Article 334) is indoor-only. Underground use UF-B direct-buried cable or THWN-2 conductors in conduit. NM-B in underground conduit still fails because the location is wet.
What size wire for a 60 A garage 100 ft away?
4 AWG copper THWN-2 (85 A at 75 °C per NEC 310.16) on a 60 A breaker, with a 10 AWG ground per Table 250.122. At 60 A over 100 ft the drop is about 3.7 V (1.55 %), comfortably inside the 5 % guidance.
Does a detached garage need its own ground rod?
Yes. NEC 250.32 requires a grounding electrode at the detached structure, connected to the subpanel ground bar. Keep the neutral isolated from ground in the subpanel — bond them only at the main service.
Do garage receptacles need GFCI?
Yes. NEC 210.8(A) requires GFCI protection for 125 V receptacles in garages. Use GFCI breakers or receptacles on those branch circuits; the 240 V feeder itself is not a GFCI branch circuit.