A three-phase motor nameplate that reads 230 delta / 400 star confuses even experienced installers: the same motor takes two different voltages depending on how its six winding ends are linked. Wire it for the wrong one and it either burns on overvoltage or stalls on undervoltage. This guide reads the plate, links the terminals correctly, and sizes protection.

References: NEC 430.22 for conductor sizing at 125 percent of full-load current, NEC 430.32 for overload protection, IEC 60364-4-41 for fault protection, and NEMA MG-1 for nameplate data. Worked numbers use a 7.5 kW 400 V motor at 0.86 power factor and 0.87 efficiency.

1. Read the nameplate in ten seconds

Find three entries: voltage with its connection symbol, full-load current for each voltage, and speed with duty. A plate marked delta 230 V / star 400 V / 13.5 A / 7.8 A means each winding coil is built for 230 V: in delta each coil sees line voltage directly, in star each coil sees line voltage divided by root three.

The trap is reading only the current: 13.5 A belongs to 230 V delta and 7.8 A belongs to 400 V star. Protecting a 400 V star motor with a breaker picked from the 13.5 A column oversizes protection by 73 percent and the overload may never trip on a real overload.

2. Star versus delta: what changes electrically

In star (Y) the three winding ends meet at a common point and each coil sees phase voltage, U_phase = U_line / 1.732. In delta the windings form a triangle and each coil sees full line voltage. Same motor, same shaft power — different terminal voltage and different line current by a factor of root three.

Torque follows voltage squared, so a motor wired star on a delta-rated supply delivers one third of rated torque and stalls under load. A motor wired delta on a star-rated supply sees 73 percent overvoltage per coil and saturates the iron within minutes. Both mistakes smell the same; only the nameplate tells them apart.

3. The six-terminal box

Open the terminal box: six studs marked U1-V1-W1 for winding starts and U2-V2-W2 for winding ends. Star links U2-V2-W2 together with the supplied bars and feeds U1-V1-W1. Delta links U1-W2, V1-U2, W1-V2 in three pairs and feeds the three junctions.

Verify before energizing: in star, continuity between any two line terminals passes through two coils; in delta, through one coil and two coils in parallel. A dead short between all six studs means someone left all three bars across everything — remove and re-link per the diagram inside the lid.

4. Full-load current calculation

Line current for a three-phase motor: I = P / (1.732 x U x cos x eta). For our 7.5 kW example at 400 V star: I = 7500 / (1.732 x 400 x 0.86 x 0.87) = 7500 / 518.5 = 14.5 A. Nameplates vary with exact efficiency, so expect 14.1 to 14.9 A on real 7.5 kW frames — always use the stamped current for protection, the formula for verification.

At 230 V delta the same machine draws 7500 / (1.732 x 230 x 0.86 x 0.87) = 7500 / 298.1 = 25.2 A. Ratio 25.2 / 14.5 = 1.74, which is root three within rounding. If your two computed currents are not in this ratio, one of the inputs is wrong.

5. Current table for common frame sizes

Approximate full-load currents at 400 V, cos 0.85, efficiency 0.86 to 0.90. Use for cable and starter shortlisting; set overloads from the actual nameplate.

Motor kWFLC at 400 V (A)Copper cable Cu (sq mm)Breaker frame hint
1.53.01.510 A, C-curve
3.06.11.5 to 2.516 A, C-curve
5.511.02.5 to 420 A, C or D
7.514.5425 A, C or D
1528.56 to 1040 A, D-curve
2241.510 to 1663 A, D-curve

6. Star-delta starting: why and when

Direct-on-line starting draws 6 to 8 times full-load current for a few seconds. Star-delta starting connects star first (one third current, one third torque), then switches to delta near full speed. It needs six leads to the motor and a timer set to change over at about 80 to 90 percent of rated speed.

Use it only where the load tolerates one-third torque during run-up: unloaded fans, pumps against a closed valve, long conveyors started empty. A loaded crusher or a full screw compressor stalls in star and then slams into delta at low speed — worse than a direct start. That job needs a soft starter or a variable-frequency drive instead.

7. Protection sizing without guessing

Conductors: 125 percent of nameplate full-load current per NEC 430.22 — our 14.5 A motor needs cable rated at least 18.1 A, so 4 sq mm copper (about 24 to 32 A depending on method per IEC 60364-5-52). Overload relay: set at nameplate current, trip class 10 for normal starts, class 20 for long run-ups. Short-circuit protection: motor-rated breaker or fuses that ride through the start without nuisance tripping.

Starter wiring detail for star-delta: size the main and delta contactors for 58 percent of full-load current (line current divided by root three flows in each delta leg) and the star contactor for 33 percent. For our 14.5 A motor that means main and delta contactors rated at least 8.4 A switching duty and a star contactor at 4.8 A — a common reason marginal starters weld on changeover is contactors picked at full line current for all three positions without checking duty.

Grounding: bond the frame through the equipment grounding conductor sized with the branch circuit; a 4 sq mm phase set takes 4 sq mm ground in this size range. Megger the windings before first energization — anything below about 5 megohms on a new motor deserves investigation, not hope. Then bump-test direction with the coupling undone: a three-phase motor that runs backward only needs two line leads swapped at the starter, never at the utility meter. Record running current on all three phases at full load; spread above 10 percent between phases points to low voltage on one leg or a developing winding fault, not to a breaker problem.

For belt-driven loads, check rotation against the arrow cast into the fan housing before tensioning belts — running backward moves air without cooling the motor properly, and the overload reads normal while the windings cook. Ten seconds of bump-test saves a rewind.

Label the starter door with the connection in words — 400 V STAR with the date — so the next person who opens the terminal box does not re-link it delta from habit. Most burned motors die from a correct plate read once and a wrong guess years later.

8. Mini-case: the 7.5 kW pump that kept stalling

A workshop wired a new 7.5 kW pump 230 delta / 400 star in star on a 400 V supply — correct — but reused the old 2.5 sq mm feed and a 16 A breaker from a 4 kW unit. It ran for weeks, then started nuisance-tripping on hot afternoons. Measurements: 15.8 A running on a 38-degree day inside a warm enclosure.

The repair: 4 sq mm copper feed (18.1 A minimum required, 2.5 sq mm was thermally marginal), overload set to the stamped 14.5 A, breaker changed to a 25 A motor-rated unit that holds the 100 A start. Starts dropped from 6 seconds of strain to 2 seconds, running current settled at 14.2 A, and the trips stopped.

9. Five mistakes that destroy motors

First, delta links on a 400 V supply for a 230 delta motor — coil overvoltage and rapid burnout. Second, star links on a 230 V supply for the same motor — one-third torque and stall. Third, protection from the wrong current column. Fourth, star-delta changeover timed by guesswork instead of speed or current. Fifth, no phase-loss protection on remote motors — single-phasing kills more motors than overloads.

11. Overload relay setting and testing

Set the overload at the stamped full-load current, not at the breaker rating, and pick the trip class for the run-up time. Test with a clamp meter at steady load: sustained current above setting must trip within the class band, and a healthy motor at rated load sits 5 to 10 percent below setting.

Trip classTrip time at 7.2x settingUse it for
Class 104 to 10 secondsNormal starts, pumps, fans
Class 10A2 to 10 secondsClose protection, short starts
Class 206 to 20 secondsHeavy starts, long run-up
Class 309 to 30 secondsVery long run-up, verify with maker

12. Assumptions and when this does not apply

Assumptions: 400 V star supply; standard dual-voltage 230 delta / 400 star frame; cos 0.85 to 0.87; direct or star-delta starting. This guide does not apply to part-winding or Dahlander two-speed motors (different terminal logic); to 690 V delta systems (read the 400/690 plate instead); to inverter-duty motors on a VFD (follow the drive manual for carrier, filters, and cable); to single-phase capacitor motors (no star or delta at all); or to hazardous-area motors where the starter must be certified with the motor.

Try it free in your browser — open the demo: https://gorkycad.com/cad/?demo=1

Frequently asked questions

My motor plate says 400 V delta. Can I run it star on 400 V?

No — star on 400 V gives each 400 V-rated coil only 230 V, so the motor makes one third torque and stalls under load. Star that motor only on a 690 V supply. Match the connection to the supply voltage.

Do I need six wires for star-delta starting?

Yes. Star-delta needs all six winding ends at the starter (three contactors plus timer). With only three leads you get direct-on-line only — or use a soft starter instead.

What breaker for a 7.5 kW motor at 400 V?

Conductors at 125 percent of nameplate (about 18 A for 14.5 A FLC, so 4 sq mm copper) with a motor-rated 25 A breaker that rides through the start. Set the overload relay at nameplate current.

Why does my motor hum and not start?

Usually single-phasing (lost phase), a seized load, or star connection on a delta supply giving one-third torque. Check all three line voltages at the starter, then the links in the terminal box.

Star-delta or soft starter for a pump?

Star-delta if the pump starts against a closed valve and torque dip is acceptable; soft starter if you need adjustable ramp, current limit, or pump-stop control against water hammer. VFD if you also need speed control.