One more check before submitting: confirm the occupancy row with the authority having jurisdiction. Mixed-use floors (office plus retail plus restaurant) are computed area-by-area at each row's rate, not at a blended average — a 200 m² floor split 120/50/30 across office/retail/restaurant gives 120×14.0 + 50×20.4 + 30×21.5 = 1,680 + 1,020 + 645 = 3,345 VA, about 20 % more than the pure-office number. Area takeoffs come from outside dimensions per 220.12, so remeasure rather than trusting leasing brochures.

Commercial lighting starts with one number: volt-amperes per square foot. NEC 220.12 gives a table of lighting loads by occupancy — offices, schools, warehouses, shops — and the service, feeder, and panel calculations all build on it. This guide shows the table, works a full 200 m² (2,150 sq ft) office example, compares LED reality against the code numbers, and ends with a panel-ready load schedule.

All code values below are NEC 220.12 unit loads. Metric conversions use 1 sq ft = 0.0929 m²; IEC 60364-8-1 energy-efficiency notes are referenced where the NEC is deliberately conservative.

1. Why volt-amperes per square foot

Before a single fixture is picked, the engineer needs a load the building will certainly stay under. NEC 220.12 provides it: a minimum lighting load per unit area by occupancy type, in VA per square foot. Multiply floor area by the unit load and you have the lighting load for service and feeder sizing — no fixture schedule required. Later, the real LED design usually comes in far lower, but the code floor guarantees the infrastructure is never undersized.

2. NEC 220.12 unit loads (abridged table)

Values are volt-amperes per square foot of floor area, NEC 220.12. Armories, assembly halls, and other occupancies have their own rows — check the full table for the exact occupancy.

OccupancyVA / sq ft≈ VA / m²
Offices (business)1.314.0
Schools3.032.3
Retail stores1.920.4
Warehouses (storage)0.33.2
Apartments (dwelling)3.0*32.3
Restaurants2.021.5
Churches / assembly1.0–2.210.8–23.7

* Dwelling-unit lighting falls under 220.14(J)/220.16 with its own 3 VA/sq ft general-lighting rule — same number, different article path.

3. Worked example: 200 m² office

Floor area: 200 m² = 2,153 sq ft. Unit load for offices: 1.3 VA/sq ft. Lighting load = 2,153 × 1.3 = 2,799 VA ≈ 2.8 kVA. At 208Y/120 V three-phase, lighting current I = 2,799 / (1.732 × 208) = 2,799 / 360.4 = 7.77 A. Continuous load (commercial lighting on ≥3 h) gets the 125 % factor per NEC 215.2/230.42: feeder sizing basis = 2,799 × 1.25 = 3,499 VA ≈ 9.71 A.

Add receptacles separately: NEC 220.14(K) requires at least 1 VA/sq ft for office receptacles (non-dwelling) — another 2,153 VA here, non-continuous unless the tenant says otherwise. General lighting + receptacles ≈ 2.8 + 2.15 = 4.95 kVA before HVAC and equipment.

4. LED reality versus code numbers

A modern LED office delivers 300–500 lux at roughly 5–8 W/m² installed. Our 200 m² office at 6 W/m² draws 1,200 W real — against the 2,799 VA code floor. The code number is 2.3× the LED reality. That gap is intentional: 220.12 sizes infrastructure, not the lighting bill. Never substitute measured LED watts for the code load in service calculations; use the real watts for energy estimates and the code VA for panels, feeders, and the service.

MetricOur 200 m² office
NEC 220.12 lighting load2,799 VA
With 125 % continuous factor3,499 VA
Real LED installed (6 W/m²)1,200 W
Ratio code / real2.33×

5. From area load to circuits and panels

Lighting at 120 V, 20 A circuits: each circuit carries 20 × 120 = 2,400 VA, continuously 1,920 VA (80 %). Our 3,499 VA continuous-equivalent needs ceil(3,499 / 1,920) = 2 lighting circuits minimum; design practice adds a spare → 3 circuits. Receptacles: 2,153 VA / 1,920 = 2 circuits minimum. So the lighting-plus-receptacle scope is about 5 branch circuits — a small panelboard section, not a full panel.

Full service picture for the 200 m² office: lighting 2,799 VA + receptacles 2,153 VA + two 5-ton HVAC units (~7,000 VA each) + elevator/kitchenette loads per nameplate. Say HVAC plus equipment totals 20,000 VA: general total ≈ 24,952 VA. At 208Y/120 V three-phase, service current ≈ 24,952 / 360.4 = 69.2 A → next standard service 100 A (NEC 230.42/230.79). The lighting that started this article is 11 % of the service — which is exactly why section 9's warehouse warning matters: size the service from the sum, never from lighting alone. Demand factors from Article 220 Part IV (e.g. Table 220.42 lighting demand for offices over 20 kVA) then trim the feeder where the occupancy qualifies.

6. Example panel schedule (lighting section)

CircuitLoadVA (cont.)BreakerWire
L1 — open office northLED 480 W75020 A / 1P12 AWG
L2 — open office southLED 480 W75020 A / 1P12 AWG
L3 — meeting + corridorLED 240 W1,999*20 A / 1P12 AWG
R1–R2 — receptacles1,077 VA each2,15320 A / 1P ×212 AWG

* L3 carries the balance of the code floor: the schedule shows real watts plus the code-required spare capacity in the panel total. Document both — inspector sees code VA, owner sees real watts.

7. Common mistakes with 220.12

Using net leasable area instead of gross floor area (220.12 uses the outside dimensions of the occupancy); mixing dwelling 3 VA/sq ft into commercial math; forgetting the 125 % continuous factor on feeders and services; applying LED watts as the service load; and omitting receptacle load (220.14) from the panel total because "lighting is done".

Two more field errors worth naming. First, double-counting: engineers who add the full 220.12 lighting load and then add the lighting panel schedule watts on top — the schedule is detail inside the code number, not extra. Second, wrong voltage base: computing 277 V lighting current with 120 V math triples the apparent current (12.6 A real vs 29 A wrong) and oversizes feeders two sizes. Always write the voltage next to every current on the schedule — "9.71 A @ 208Y/120" — so the checker can verify the base in one glance.

8. Assumptions and when this does not apply

  • New commercial interiors under NEC jurisdiction, 208Y/120 V or 480Y/277 V. Dwelling units use Article 220 Part III instead.
  • General lighting only — display, track, task, horticultural, and sports lighting add on top per 220.14(G)–(K).
  • No local energy code override: ASHRAE 90.1 / IECC lighting power density limits cap the installed watts below older practice but do not change the NEC minimum load.
  • Office occupancy at 1.3 VA/sq ft; verify the exact row for mixed occupancies (each area at its own rate).

9. Mini-case: warehouse that almost got a tiny service

A 1,000 m² (10,764 sq ft) storage warehouse at 0.3 VA/sq ft gives only 3,229 VA of lighting — the owner proposed a 60 A service. But receptacles, dock equipment, chargers, and office mezzanine added 40 kVA of real load. The VA-per-square-foot number was correct and tiny; the mistake would have been stopping there. Service sizing always sums lighting (220.12) + receptacles (220.14) + equipment (nameplate) + HVAC — never lighting alone.

10. Why 277 V lighting changes the circuit count

Many commercial buildings run lighting at 277 V (phase to neutral of a 480Y/277 V system) instead of 120 V. Same 3,499 VA continuous-equivalent at 277 V draws only 3,499 / 277 = 12.6 A total, so one 20 A circuit carries 20 × 277 × 0.8 = 4,428 VA continuous — our whole 200 m² office lighting fits on a single 277 V circuit with margin, versus two to three circuits at 120 V. That is why 480Y/277 V dominates large commercial work: fewer home runs, thinner voltage drop (drop scales with current), and smaller panels. The trade is fixture voltage ratings and qualified maintenance — 277 V ballasts, drivers, and switches must be explicitly rated for it, and local rules may restrict 277 V in dwelling or small-retail zones.

11. Energy codes cap your watts (ASHRAE 90.1 / IECC)

The NEC sets the minimum infrastructure load; energy codes set the maximum installed watts. ASHRAE 90.1 and the IECC limit lighting power density (LPD) — roughly 0.9–1.1 W/sq ft for offices by the building-area method in recent editions, i.e. about 10–12 W/m². Our LED design at 6 W/m² sits comfortably under the cap, while an old fluorescent layout at 14 W/m² would violate it. Compliance is shown with the lower of the space-by-space or building-area methods plus mandatory controls (occupancy sensors, daylight dimming, automatic shutoff). Design sequence: pick LED layouts under the LPD cap, then verify the service against the NEC floor — the two numbers answer different questions and both must pass.

12. See also and try it on your plan

Convert the load with the kW to amps calculator, build the full estimate with electrical load calculation, and lay out the breakers with the panel schedule generator. Wire sizing: cable size calculator.

Enter the floor area and occupancy in the free demo: it builds the load schedule, the panel, and the PDF estimate automatically.

Try it on your own plan — open the free demo at https://gorkycad.com/cad/?demo=1, no registration needed.

Frequently asked questions

What is the NEC lighting load for offices?

NEC 220.12 specifies 1.3 VA per square foot for business (office) occupancies, measured on gross floor area. A 2,153 sq ft (200 m²) office gives 2,799 VA of lighting load, upsized by 125 % to 3,499 VA for continuous-load feeder sizing.

Do LED watts replace the NEC lighting load?

No. The 220.12 VA-per-square-foot value sizes services, feeders, and panels; LED installed watts (often 2–3× lower) are used for energy estimates. Use code VA for infrastructure, real watts for the power bill.

How many lighting circuits does an office need?

Divide the continuous-equivalent lighting VA by 1,920 VA per 20 A 120 V circuit (80 % of 2,400 VA). Our 200 m² office needs 2 circuits minimum for 3,499 VA; add a spare for 3.

What about receptacles in commercial load math?

Add them separately — offices need at least 1 VA/sq ft for receptacles per NEC 220.14(K), plus any known equipment loads. Lighting alone never sizes a commercial service.

Does the 125 % factor apply to lighting?

Yes for continuous lighting (on 3+ hours): feeders, services, and overcurrent devices are sized at 125 % of the continuous load per NEC 215.2, 215.3, and 230.42. The branch examples in this article show both raw and factored numbers.