SP 76: wiring installation, concealed works acts, 0.5 MΩ testing, switchgear.
| Document | SP 76.13330.2016 Electrical installations (Russia) |
| Edition | 2016 (СП 76.13330.2016) |
| Status | Current |
| Issued by | Ministry of Construction of Russia |
| Applies to | Electrical installations: wiring, switchgear and lighting installation and acceptance |
| № | Chapter / section |
|---|---|
| 5 | General |
| 6 | Wiring |
| 7 | Cable lines |
| 8 | Switchgear |
| 9–11 | Lighting, earthing, testing |
Installation per design; materials with certificates and incoming inspection.
Concealed wiring documented with acts before closing; cable radii, marking, sheath earthing.
Insulation ≥ 0.5 MΩ for LV, PE continuity, RCD tripping, phase rotation — with protocols.
Automatic single-line diagrams, PUE/GOST/IEC calculations, specification and PDF — from one model.
Start freeData is for reference. Final design decisions must follow current regulations and a qualified engineer.
← Back to the country: PUE Russia: Rules for Electrical Installations · World electrical installation rules